Laserfiche WebLink
City of Elk River <br /> Jackson Street Water Tower Condition Assessment July 1,2015 <br /> CDG Project#15010.00 <br /> OBSERVATIONS REFERENCE PHOTO <br /> 2. The Water Tower <br /> was constructed in r <br /> 1920. Ir <br /> - <br /> b, � �► <br /> 14 <br /> 4> (��f <br /> 3. The Water Tower <br /> has four concrete <br /> footings with -*• <br /> varying amounts of <br /> exposure due f6, <br /> surrounding <br /> landscape. All <br /> footings appear to <br /> be in avera <br /> g <br /> condition,with no <br /> significant <br /> deficiencies noted. ... <br /> 4 <br /> COLLABORATIVE DesignGroup,inc. <br />