My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.2. SR 07-06-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
07-06-2015
>
10.2. SR 07-06-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2015 4:42:57 PM
Creation date
7/1/2015 4:38:04 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/6/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Honorable Mayor and City Council <br /> June 22, 2000 <br /> Page 4 <br /> One final consideration is the cost of such a change to the construction. We have <br /> estimated using Latour Construction bid prices that the added cost to connect old CSAH <br /> 13 to Tyler Street would be approximately $60,000. <br /> In conclusion, the construction of a cul-de-sac on CSAH 13 will increase the length of <br /> the trip on southbound CSAH 13 to westbound CSAH 12 by approximately a half a mile. <br /> Given this small inconvenience to these trips created by a cul-de-sac and given the <br /> additional conflicts and confusion at the intersection of Main Street and TH 169 if old <br /> CSAH 13 is connected to Tyler Street, I would strongly recommend that the plan to cul- <br /> de-sac CSAR 13 remain in place. I will be in attendance at your meeting on June 26, <br /> 2000, and prepared to make a brief presentation on these various issues and then <br /> answer any questions the City Council or Public may have. <br /> Sincerely, <br /> Howard R. Green Company <br /> Terry J. Maurer, P.E. <br /> UF-062100—City Council--CSAH13&Ty1er <br /> Howard R.Green Company <br /> CONSULTING ENGINEERS <br />
The URL can be used to link to this page
Your browser does not support the video tag.