My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-16-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
06-16-2015
>
4.2. ERMUSR 06-16-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 10:37:31 AM
Creation date
6/15/2015 11:29:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT EXPERIENCE <br /> COON RAPIDS PUBLIC WORKS FACILITY <br /> ASTER PLAN AND ADDITION <br /> oon Rapids, MN <br /> 1 ::::,,,,,,T,T7 wir....i., ' :_-":;',. l»1111I1�llllL/�r.; 44--- <br /> ...�h► <br /> Tr. r <br /> e <br /> P J_ <br /> ' J=`. �ra <br /> tam, >t MASTER PLAN STUDY <br /> k. ;:. ' Coon Rapids Public Works <br /> E' '. <br /> ROJECT SUMMARY PROJECT DESCRIPTION <br /> lient:City of Bloomington,MN <br /> S'ze:$2,389,744 The Coon Rapids Public Works Facility project The building was modular in nature, <br /> was mulit-phased additions for heated storage which provided for cost saving and ease of <br /> •ar:2006 and repair bays.The existing building was a construction.For the first phase,the final cost <br /> precast structure and the new addition was was 21%under budget and the building was <br /> •EFERENCE designed to match its concrete panels. completed for early occupancy. <br /> S eve Gatlin,Director of Public Services <br /> 11155 Robinson Dr.,Coon Rapids,MN 55433 Kodet Architectural Group added a mezzanine For the second phase,Kodet worked with <br /> 763.755.2880 as well as other interior amenities to make the the City of Coon Rapids to design a garage . <br /> building function better. In addition,energy addition that includes heated storage and <br /> efficient heating and ventilation systems vehicle repair space.We remodeled the <br /> were a part of the overall design.One of the existing building to provide better storage <br /> key elements was to design the facility to and more staff support areas. <br /> accommodate bad soil conditions.Located <br /> on an extremely flat site,the design took <br /> into account drainage and environmental <br /> concerns. <br /> 8 Kodet Architectural Group, Ltd. KODET 1111 � <br /> 99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.