My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.2. ERMUSR 06-16-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
06-16-2015
>
4.2. ERMUSR 06-16-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2015 10:37:31 AM
Creation date
6/15/2015 11:29:34 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
6/16/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT EXPERIENCE <br /> WEST ST. PAUL MAINTENANCE FACILITY <br /> NEW DESIGN & CONSTRUCTION j <br /> West St. Paul, MN <br /> I <br /> . <br /> s <br /> 1 . <br /> , t1 r e, . <br /> ' • 1.illt ii,........ ,__,... ..... . me , r, <br /> qi r`' <br /> I <br /> - <br /> --, 1" MASTER PLAN STUDY <br /> West St.Paul <br /> Maintenance Facility <br /> R <br /> PROJECT SUMMARY PROJECT DESCRIPTION <br /> Client:City of West St.Paul,MN <br /> Size: 51,071 sq.ft. The West St.Paul Maintenance Facility is a Kodet was the architect teaming with <br /> Cost:$5,784,000 replacement of the City's existing,outdated Collaborative Design Group on the project. <br /> building on a new site. This new facility Design concepts included an architecturally <br /> Completed:2010 pleasing landscaped edge to the adjacent <br /> greatly enhances the efficiency of public P g p g I <br /> works by housing their entire vehicle fleet int residential neighborhood,site organized <br /> REFERENCE heated covered storage and providing a state for efficient vehicle movement and security, <br /> Matt Saam,Public Works Director of the art maintenance garage and welding building design to allow for future expansion, <br /> 1616 Humboldt Ave West,St.Paul,MN 55118 shop. overhead cranes and vehicle hoists for <br /> 651.552.4100 a variety of vehicle sizes,and office and <br /> Incorporating many sustainable concepts lunchroom design for efficient crew staging <br /> in the design,Kodet used this project in and operations. <br /> seminars as a case study for LEED concepts <br /> in maintenance buildings.Sustainable <br /> concepts included a geothermal system <br /> with vertical loops,on site holding ponds <br /> to filter stormwater,green materials locally <br /> available and with high recycled content,and <br /> preservation of trees on site. <br /> CITY OF ELK RIVER MUNICIPAL UTILITIES 27 <br /> 98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.