Laserfiche WebLink
Table 6.1 Priorities - Momentum Actions and Projects <br />riority Actions 15 Cost Estimate <br />Skate Park $400,000 <br />Adult Fitness Features $25,000 <br />Orono <br />Youth Athletic Complex <br />Woodland Trails <br />L <br />Neighborhood Parks (various) <br />Bailey Point Nature Preserve <br />V <br />I <br />All Parks <br />Splash Pad <br />Restrooms <br />Parking lot paving (to follow concept plan) <br />New and extended trail (to follow concept plan) <br />Restrooms <br />Parking Lot Paving <br />Finish Building <br />Maintenance Shed <br />Field Lights — (1 -6) <br />Playground <br />Upgrade Irrigation and Well <br />Additional Fencing <br />Maintenance Shed <br />On- going, based on amenity life -cycle and <br />replacement needs <br />Nature Preserve Improvements (trailhead, parking <br />lot, natural resource restoration, picnicking, <br />signage, boardwalk, bridge, trails, site amenities). <br />Trail gaps /neighborhood connections to Great <br />Northern Trail <br />Complete trail connection between Mississippi <br />River /Main Street and the Great Northern Trail <br />Sign trail connections as part of the Signage and <br />Wayfinding Plan <br />Park signage as part of the Signage and Wayfinding <br />Plan <br />Comprehensive recreation facilities study to <br />evaluate the Activity Center (55 +), Arena, Lions <br />Buildings Park Center, and the Trott Brook Barn and <br />determine if they should be renovated, replaced on <br />their current site, or consolidated into a centrally <br />located facility <br />Oak Knoll Parking lot upgrades, toilets, lights, bleachers, <br />better back stops <br />71 City of Elk River - Parks and Recreation Master Plan <br />$650,000 <br />$250,000 <br />$600,000 <br />$425,000 <br />$200,000 <br />$600,000 <br />$75,000 <br />$75,000 <br />$800,000 <br />$175,000 <br />$20,000 <br />$5,000 <br />$100,000 <br />Amenity life -cycle <br />replacement costs - TBD <br />based on individual park <br />needs over time <br />$640,000 <br />$3,250,000 <br />$1,400,000 <br />Based on signage and <br />wayfinding master plan <br />(currently in process) <br />Based on signage and <br />wayfinding master plan <br />(currently in process) <br />$575,000 <br />