My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.0. SR 04-03-2000
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2000
>
04/03/2000
>
4.0. SR 04-03-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:38 AM
Creation date
5/17/2004 7:53:15 PM
Metadata
Fields
Template:
City Government
type
SR
date
4/3/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Pat Klaers <br />March 23, 2000 <br />Page Four <br /> <br />Western Area Phase 4 Improvements <br /> <br />The project was petitioned for by Stewart Wilson and includes Business Center Drive <br />westerly to Waco Street, the realignment of Waco Street to the east, a new intersection <br />with T.H. 10, the signalization of that intersection, the reconstruction of the north <br />frontage road from the new Waco Street intersection easterly to Naples Street, the <br />closing of old Waco Street intersection with T.H. 10 and the access to T.H. 10 at the <br />Sherburne County Government Center. In addition to the street improvements, there <br />would be lateral sanitary sewer along Business Center Drive, trunk watermain along <br />Business Center Drive and Waco Street and lateral watermain along the north frontage <br />road to create a looped system. In addition, there will be lateral storm sewer along all <br />three of the roads; Business Center Drive, Waco Street, and the north frontage road. <br />The public hearing was held on March 13th. The plans and specifications are <br />approximately 95% complete and have been submitted to Mn/DOT for their preliminary <br />review. We are expecting cooperative agreement funding from Mn/DOT. It takes about <br />13 weeks for Mn/DOT to prepare a cooperative agreement so it is anticipated the <br />earliest this project could proceed to construction would be in early summer of 2000. <br /> <br />Pedestrian Bridge <br /> <br />The pedestrian bridge that crosses TH 169 was substantially complete in 1999. <br />However, there is still a minor amount of work to be completed in the spring of 2000. It <br />is anticipated that there will be a grand opening of the bridge scheduled in spring of 2000 <br />with Congressman Oberstar, since he was responsible for providing the funding for the <br />construction of the pedestrian bridge. <br /> <br />4. TH 10/Main Street Intersection Geometrics <br /> <br />We are currently working on the layout and analysis of potential improvements to the <br />TH 10/Main Street intersection. We have had preliminary discussions with Mn/DOT <br />regarding their interest in helping fund improvements at this intersection. They have <br />indicated a willingness to consider participating in the funding of geometric and signal <br />improvements at this intersection due to the TH 101 bridge replacement that is planned <br />for 2001 or 2002. We anticipate that the analysis and layout for potential improvements <br />to this intersection will be completed in the spring of 2000 and be ready for City Council <br />consideration and review by Mn/DOT. <br /> <br />C. PRIVATE DEVELOPMENTS <br /> <br />This area summarizes those private developments that we anticipate will be completed in <br />2000. The City Engineer's role is to provide construction inspection services to ensure <br />compliance with approved plans and City specifications. <br /> <br />I. Lafayette Woods 4th Addition <br /> <br /> This will complete the Lafayette Woods development. The improvements were reviewed <br /> and approved by staff in the fall of 1999; however, the developer did not ask for or <br /> receive final plat approval. We anticipate that this will happen in the spring of the year, <br /> and the construction of the improvements to complete this development will proceed <br /> forward. <br /> <br />O:\PROJ~30000M\0325\Itr 1-31-00 klaers.doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.