My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.8. SR 05-17-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
05/17/2004
>
6.8. SR 05-17-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:38 AM
Creation date
5/14/2004 7:41:00 PM
Metadata
Fields
Template:
City Government
type
SR
date
5/17/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Memo to Mayor 8: City Coundl/P 04-02 <br />April 19, 2004 <br />Page It <br /> <br />(7) <br /> <br />The proposed subdivision will not have an undue and adverse impact on the <br />reasonable development of neighboring land. <br /> <br />(8) The proposed subdivision is not premature. A subdivision is premature if any of the <br /> following exists: <br /> a. Lack of adequate stormwater drainage. <br /> b. Lack of adequate roads. <br /> c. Lack of adequate sanitary sewer systems. <br /> d. Lack of adequate off-site public improvements or support systems. <br />Staff recommends that approval of the preliminary plat for Woodland hills include the <br />following conditions: <br /> <br />A DEVELOPERS AGREEMENT BE PREPARED AND EXECUTED OUTLINING THE TERMS <br />AND CONDITIONS OF THE PLAT APPROVAL PRIOR TO RELEASING THE PLAT FOR <br />RECORDING. <br /> <br />2. SURFACE WATER MANAGEMENT FEE BE PAID IN THE AMOUNT REQUIRED BY THE CITY <br /> AT THE TIME OF FINAL PLAT PRIOR TO RELEASING THE PLAT FOR RECORDING. <br /> <br />3. THE LEI'I'ER OF CREDIT SHALL COVER WETLAND MITIGATION. DRAINAGE EASEMENTS <br /> SHALL BE IN PLACE OVER THE WETLAND AND THE WETLAND MITIGATION AREAS. <br /> <br />4. RESTRICTIVE COVENANTS SHALL BE RECORDED ON THE WETLAND AND THE WETLAND <br /> MITIGATION AREAS. <br /> <br />5. A THREE YEAR MONITORING REPORT ON THE WETLAND MITIGATION IS REQUIRED. <br /> <br />6. THE CITY ENGINEER'S COMMENTS BE INCORPORATED INTO THE PLANS. <br /> <br />7. STREET LIGHTS BE INSTALLED AS REQUIRED BY ELK RIVER UTILITIES <br /> <br />8. A LE'rrER OF CREDIT BE PROVIDED TO THE CITY IN THE AMOUNT OF 100% OF THE <br /> COSTS OF THE PUBLIC IMPROVEMENTS. <br /> <br />10. <br /> <br />11. <br /> <br />UPON COMPLETING ALL OF THE IMPROVEMENTS AND HAVING THEM ACCEPTED BY <br />THE CITY, A WARRANTY BOND IN THE AMOUNT OF 25% OF THE IMPROVEMENT <br />COSTS SHALL BE SUBMI'rrED TO THE CITY FOR THE PERIOD OF ONE YEAR. <br /> <br />A SEALCOAT FEE IN THE AMOUNT TO BE DETERMINED BY THE CITY ENGINEER BE PAID <br />PRIOR TO RELEASING THE PLAT FOR RECORDING. <br /> <br />A GRADING AND EROSION CONTROL PLAN BE APPROVED BY THE CITY ENGINEER <br />PRIOR TO THE ISSUANCE OF BUILDING PERMITS. <br /> <br />12. A DEVELOPMENT PLAN BE APPROVED BY THE CITY ENGINEER PRIOR TO THE <br /> ISSUANCE OF BUILDING PERMITS. <br /> <br />13. ALL GRADING BE CERTIFIED PRIOR TO THE ISSUANCE OF BUILDING PERMITS. <br /> <br />S:M~LANNING\Case Files\2004\P 04-02 Woodland HillsM)04-02cc4'19-doc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.