Laserfiche WebLink
Feb. 8, 1983 BIKEWAYS -28- <br /> • <br /> Bridge <br /> • <br /> d ' <br /> 30' 0 tea+ <br /> 12' 10' 1' 6" Rail or `Bikeway ti:1 <br /> I fence as co <br /> needed <br /> • Earthfill Modification Of <br /> Roadway 9,, min. Culvert Existing Facilities <br /> Bridge <br /> c: <br /> Rail or fence as needed 0a� <br /> 12' 10' 1, 6" Bikeway ti:1 <br /> gIVIPw <br /> Earthfill <br /> c, Roadway Retaining Wall Culvert <br /> 0 <br /> • <br /> Bridge <br /> 30' 0 <br /> Bikeway Design For <br /> 12' 10' 1' 6" New Facilities <br /> 1r <br /> 6:1 3.1 <br /> c, Roadway 1.5'Min. <br /> 30' or more desirable <br /> Bikeway <br /> 12' • <br /> 10' _ 1'6" Roadway <br /> Approaching <br /> 0 lt�ax' <br /> 6:1 $.111°— 2:1 0.5' <br /> Roadway 1.5'Min. <br /> Ql 0.2 ft./ft. slope • <br /> 0 10' desirable: 8'minimum. See section F for explanation. <br /> 30 A barrier wall (Standard Plans 5-297.601 and .603) may be used between piers. <br /> FIGURE N <br /> OFF ROAD BIKEWAYS UNDER BRIDGE STRUCTURES - RURAL <br />