Laserfiche WebLink
�- 1 <br />a. New development. For new, nonlinear developments_.that create more than one acre of new <br />m2pervious surface on sites without restrictions- stormwater runoff volumes will be <br />controlled the post - construction runoff volume shall be retained on site for 1.1 <br />inches of runoff from all impervious surfaces on the site. <br />b. Redevelopment. Redevelopment projects (including linear projects). on sites without <br />restrictions that create new impervious surfaces shall capture and retain on site 1.1 <br />inches of runoff from the new impervious surface and show a net pollutant reduction <br />for any reconstructed impervious surfaces. <br />6. Water QuQE <br />a. Total suspendcdsohds. Treatment also must achieve an 80, percent removal of <br />suspended solids. <br />b. Phosphorus control. Stormwater shall be treated to remove 60 percent of the post - <br />development phosphorus load on an annual basis before discharge to natural water <br />bodies. The amount of total phosphorus removed should be modeled using the Minimal <br />Impact DesiWi Standards (MUDS) calculator or an equivalent water quality, modeling <br />program. Where water duality ponding is exclusively used to meet the phosphorus <br />removal requirement, the ponds must be sized to store the site runoff from a two and <br />one -half inch rainfall below the normal outlet elevation. <br />7_e:. Rate Control. For post - construction rate control modeling a minimum curve number <br />of 84 shall be used on all disturbed /graded soil areas, due to soil compaction impacts, unless <br />Soil Protection /Compaction Remediation specifications have been incorporated into the <br />Proposal (Plan Set, Stormwater Management Plan, etc.) and are approved bby the City <br />Engineer. Atlas 14 shall be used in all rate - control estimates. <br />New ronstrzution._Projects shall have no increase in runoff from th , <br />grease, T-rea"ent also most ftehie-ee a 60 per-eent r-emoval of suspended solids. <br />both, <br />a . predevelopment peak runoff rates for the twe2. 10, and 100 year; 24 <br />hour storm everrtevents. <br />PGge <br />16 <br />