My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.a-f. ERMUSR 02-10-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
02-10-2015
>
6.1.a-f. ERMUSR 02-10-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2015 12:24:22 PM
Creation date
2/10/2015 12:24:20 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/10/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Wade Lovelette—Superintendent of Technical <br /> John Dietz—Chair Services <br /> Al Nadeau—Vice-Chair <br /> Daryl Thompson- Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> February 10, 2015 6.1d <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • The Locating department had a total of 91 locate tickets in January; two of them being <br /> emergency tickets, two cancellation, one meet, 73 normal tickets,three boundary surveys, <br /> one non-excavation,two engineering DSG's and seven updated tickets. When Richard is <br /> not locating he is working on map book updates and the ArcView maps. <br /> • In January,the Security Systems Department had a total of 106 phone contacts, 10 systems <br /> quoted, eight system sales made, 12 installs completed, 23 service calls and 10 personal <br /> visits. <br /> • Electric Technicians continue with the meter reading,power bill, substation checks,hanging <br /> red-tags,meter read-outs, dealing with meter and off-peak issues, and delivering and <br /> installing new meters to commercial customers. They continue to change out the three phase <br /> meters to radio read meters and help with the monthly engine runs. They are also re- <br /> programming three-phase meters in the field for commercial and industrial loads. Jeff has <br /> been doing some infrared testing on distribution equipment. <br /> • The power plant staff could not do the monthly engine run in January as Fratalone <br /> Excavating is currently dredging the cooling pond for the generators. Staff did the annual <br /> web deflections on the engines since they were down. Wheeler World Inc. was here the last <br /> week of January to begin the engine air upgrades on engine no. 3. <br /> • Staff continues to collect data with the GPS for our ArcView maps as time permits. <br /> wl% rWERED ® Y fll Page 1 of 1 ATURE <br /> Reliable Public <br /> POWERED Power Provider T o S E R V E <br /> 75 <br />
The URL can be used to link to this page
Your browser does not support the video tag.