My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.a-f. ERMUSR 02-10-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
02-10-2015
>
6.1.a-f. ERMUSR 02-10-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2015 12:24:22 PM
Creation date
2/10/2015 12:24:20 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/10/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk-Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> February 10, 2015 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delivered 3 new residential water meters. <br /> • Sealed the water meter and took curb stop ties from 2 water services. <br /> • Went on 6 Service calls. <br /> • Completed 25 BACTI/Total Chlorine Residual Samples; all confirmed negative for <br /> Coliform Bacteria. <br /> • Completed 20 routine fluoride samples. All samples met MDH standards. <br /> • The Water Operators have continued to perform annual well maintenance. They have <br /> spent the last month cleaning and reorganizing Well#3,preparing Well#2 to be <br /> sandblasted and painted, and painting at Well#7. They're making great progress towards <br /> getting our wells into the condition they should be in. <br /> • Since the new valves and hydrants have been added the GIS mapping system, we're now <br /> able to get an accurate count of how many we have. We currently have 1,222 fire <br /> hydrants and 1,454 gate valves in the distribution system. <br /> • Well#2 has been sandblasted and painted by Slack Painting. We used Badger State <br /> Inspections to do the sandblasting/paint inspection. The painting has exceeded our <br /> expectations. We did come across a few more pipes that had to be removed and replaced <br /> due to excessive pitting. We will now move onto the reinstallation of the well, and the <br /> installation of the new VFD. To finish off the project the water operators will update the <br /> chemical feed system. I hope to have a final update in March when the well is completed. <br /> Attached are before and after pictures of the Well #2 filter reconditioning. <br /> ATTACHMENTS: <br /> • January Pumping By Well <br /> • Before and After Pictures -Well#2 Filter Reconditioning <br /> marl 'POWERED BY <br /> Iir3 Page 1 of 1 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E R V E <br /> 76 <br />
The URL can be used to link to this page
Your browser does not support the video tag.