My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.a-f. ERMUSR 02-10-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
02-10-2015
>
6.1.a-f. ERMUSR 02-10-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2015 12:24:22 PM
Creation date
2/10/2015 12:24:20 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/10/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Mark Fuchs—Electric Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> February 10,2015 6.1c <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Had eight new services. <br /> • Continue working on collecting data with the GPS for our ArcView maps as time <br /> permits. <br /> • Continue tree trimming. <br /> • We are going through the map book and inspecting equipment on the overhead and <br /> underground system. <br /> • Working with the City of Elk River Streets Department to trim trees that are in the road <br /> right-of-way. <br /> • Working on testing the overhead and underground protective grounds. We are also <br /> testing the fiberglass hot sticks. Both of these are done annually. <br /> • Working on changing out existing light fixtures to LED fixtures on Joplin Street, Orono <br /> Parkway and Orono Road. <br /> • I've attached pictures of us installing a new house service with the new frost trenching <br /> attachment on our Vermeer RTX550. In the spring we'll change out the attachment and <br /> put the plow back on. It takes less than four hours to change attachments. <br /> • I'm serving on the Job Training and Safety(JTS) Committee for MMUA and will not be <br /> able to attend the commission meeting. The JTS Committee assists in setting up the <br /> upcoming schools MMUA puts on and also involved in the planning of the 2016 <br /> Lineworkers Rodeo. <br /> ATTACHMENT: <br /> • Vermeer RTX550 Frost Trenching Pictures <br /> ■��, P0WEDED BY <br /> Page 1 of 1 NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D T o S E 0.V E <br /> 70 <br />
The URL can be used to link to this page
Your browser does not support the video tag.