Laserfiche WebLink
Existing and Forecasted Daily Traffic <br /> <br />What do these maps tell <br />us about the corridor? <br /> <br />1998 O] <br />~o~~~,3oo <br />2o2~! ~ ~ 155,400 <br /> <br /> SHER~KRNE <br /> <br />Elk <br />River <br /> <br />t <br /> <br />32% Increase <br />(31,500 vehicles) <br /> <br />159% increase <br />(51,550 vehicles) <br /> <br />· Traffic volumes throughout <br />the corridor will double by the <br />year 2025. <br /> <br />· The greatest increases in <br />traffic volumes will be in the <br />subareas with the greatest <br />level of development <br />(Rogers/Otsego and Elk River). <br /> <br />What roads have these <br />volumes today? <br /> <br />Rogers to Zimmerman <br /> <br />40,000 TH 10 Between Ramsey Blvd and <br /> Thurston Ave <br /> <br />60,000 TH 10 Between Round Lake Blvd <br /> and Hanson <br /> <br />80,000 1-494 Between 1-94 and TH 55 <br /> <br />100,000 1-94 Between Weaver Lake Road <br /> and 494~694 <br /> <br />I :=':=:, I t <br /> <br />)namla <br /> <br />1998 [~ 9,900 <br />20,5~$,450 [ 91%i ....... <br />2025 1 , 118,900 (9,000vehicles) <br /> <br /> ,998~,8~°s°.zoo '---~? I-n%, ...... <br /> 20~5~ ~ .... ~:;~;- (15,700 vehicles) <br /> 2025] <br /> <br /> 1998 O~ ~" 132%, ....... <br /> 20261 <br /> <br /> Zimmerman to Garris6n <br /> <br />TH 101 - TH 169 Corridor Management Plan ,~ CH2MHILL <br /> <br /> <br />