Laserfiche WebLink
Memo to Park&Rec Commission <br /> April 8, 1998 <br /> Page 2 <br /> • • From the northwest along the county ditch easement. The wetland would <br /> need to be bridged in some way. <br /> • From the north through a future subdivision. This potential point offers <br /> the best and most direct route to the site from County Road No. 1 and a <br /> parking lot. The wetland would need to be bridged here as well. <br /> Access Within the Park <br /> A large wetland divides the park into 3 areas. In two places, bridges or land <br /> bridges could be created to connect these areas to each other. <br /> To facilitate a loop around the wetland, the park will need to be expanded <br /> northward, or an easement secured around the wetland. <br /> Wetland <br /> The wetland provides for long scenic views within the park. The users could <br /> better enjoy this amenity if access were achieved around it to the north. The <br /> wetland creates natural boundaries around the park to the west, east and <br /> north. The southern boundary will need to be better defined. <br /> Topography <br /> The site is wooded and rolling, providing few opportunities for field games <br /> like football, baseball or basketball without major regrading. However, there <br /> is one location that could fit a large 200' x 200' flat area if it were minimally <br /> regraded. <br /> • <br /> f:\shrdoc\council\park&rec\me adowva.doc <br />