Laserfiche WebLink
Pavement Ret, .... ,ration Program ,1/12/01 <br />Street Improvements Schedule <br /> <br />STREET YORK YORk <br />FROM MAIN 183RD CT. <br />TO 183RD CT. 2ND ST. <br />COMMON EXCAVATION CY $ 10,00 530.8 208.1 <br />REMOVE BITUMINOUS PAVEMENT SY $ 3.00 667.3 261.6 <br />REMOVE SIDEWALK SF $ 2.50 0.0 0.0 <br />REMOVE CONCRETE CURB & GUTTER LF $ 3.50 0.0 0.0 <br />MAILBOX RELOCATION LS $ 500.00 0.0 0.0 <br />MILL BITUMINOUS PAVEMENT SY $ 9.50 0.0 0.0 <br />AGGREGATE BASE, CLASS V TON $ 10.50 347.5 136.5 <br />TYPE 41A, WEAR COUSE MIXTURE TON $ 35.00 108.9 42.7 <br />~YPE 31B, BASE COURSE MIXTURE TON $ 34.00 84.7 33.2 <br />BITUMINOUS MATERIAL FOR TACK COAT GAL $ 1.50 44.0 17.2 <br />CONCRETE CURB & GUTTER, DESIGN B618 LF $ 8.00 546.0 214.0 <br />S" CONCRETE DRIVEWAY AND APRON SY $ 34.00 23.7 15.8 <br />2" BITUMINOUS DRIVEWAY RESTORATION SY $ 15.00 74.7 49.8 <br />CONCRETE SIDEWALK SF $ 2.50 1638.0 642.0 <br />PEDESTRIAN RAMP EA $ 300.00 2.0 2.0 <br />SODDING, LAWN AND BOULEVARD SY $ 3.00 606.7 237.8 <br />FURNISH & INSTALL SIGN PANELS. TYPE C SF $ 28.00 6.3 0.0~ <br />FURNISH & INSTALL STREET SIGNS EA $ 200.00 1.0 0.0 <br />ADJUST GATE VALVE EA $ 150.00 0.0 0.0 <br />ADJUST MANHOLE EA $ 200.00 1.0 1.0 <br />STORM SEWER LF $ 50.00 273.0 107.0 <br />STREET LIGHTING LS $ 200.00 1.0 1.0 <br /> <br />TOTAL ESTIMATED CONSTRUCTION COST: $ 44,946.05 $ 18,609.23 <br />28% OVERHEAD: $ 12,584.89 i $ 5,210.59 <br />TOTAL ESTIMATED PROJECT COST: $ 57,530.95 $ 23,819.82 <br />TOTAL COST: $ 6,936,053.65 <br /> <br />O:\Proj\802400j\costest-report 12 <br /> <br /> <br />