Laserfiche WebLink
Howard R. Green Company <br />Project No. 802400J <br /> <br />Pavement Rehabilitation Report <br /> City of Elk River, Minnesota <br /> <br />· Upland Avenue from Main Street to Trunk Highway 10 <br />· 5th Street from 5% Street to Gates Avenue <br />· Gates Avenue from 5th Street to 5% Street <br />· 5% Street from Gates Avenue to 5th Street <br /> <br />During preliminary design phase, it will be determined if additional right-of-way will be <br />necessary to construct the proposed improvements. <br /> <br />Temporary construction easements may be needed if grading is necessary outside of <br />the permanent ROW due to possible changes in the vertical street alignment. During <br />the preliminary design phase, necessary easement locations will be determined and <br />temporary construction easements acquired from individual property owners. <br /> <br />As with all construction projects, there are several permits that will need to be obtained <br />prior to construction of the proposed improvements. The required permits will depend <br />on the specific improvements of the project. They include, but are not limited to: <br /> <br />Agency <br />· Minnesota Pollution Control Agency <br />· Minnesota Department of Health <br />· Minnesota Pollution Control Agency <br />· Sherburne County <br />· Mn/DOT <br /> <br />Improvement <br /> <br />Sanitary Sewer <br />Watermain <br />Grading <br />Work within their ROW <br />Work within their ROW <br /> <br />-6- <br /> <br /> <br />