My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.0. SR 11-19-2001
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2001
>
11/19/2001
>
9.0. SR 11-19-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:30 AM
Creation date
4/28/2004 7:38:56 PM
Metadata
Fields
Template:
City Government
type
SR
date
11/19/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l ver <br /> <br />TO: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: <br /> <br /> MEMORANDUM <br /> <br />Mayor and City Council <br /> <br />Pat Klaers, City Administrator <br /> <br />November 19, 200 I <br /> <br />City Hall- Police Station Expansion <br /> <br />Item 9. <br /> <br />Thc city hall- police station expansion committee met on Thursday, November 15, 2001. <br />The committee reviewed the material and information that Gary Tushie put together since <br />receiving feedback from the Council on September 24, 2001. The committee <br />recommendations to the City Council on building options and on funding and timing issues <br />are at the end of this memo. <br /> <br />Building Layout Options <br /> <br />The following building layout options are attached for your review. <br /> <br />Page 1 <br />Page 2 <br />Page 3 <br /> <br />Page 4 <br /> <br />Page 5 <br /> <br />Existing site plan. <br />Existing floor plan of city hall and the police station. <br />Option one: police and city hall each doing a two-story addidon onto <br />the existing facility. <br />Option two: police constructing a new facility across the parking lot <br />and administration moving into the police department after <br />remodeling. <br />Option three: police constructing across the parking lot, and part of this <br />construction would be a two story facility, and administration moving <br />into the old police area once it is remodeled. This option includes a <br />fire satellite station being connected to the EOC and police station to <br />make a "public safety facility." <br /> <br />It should be noted that all three building options include the utilities in the city hall complex <br />with some joindy shared spaces (bathrooms, conference room, lunch/break room). <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.