Laserfiche WebLink
4 <br /> Potential Additional Services if required <br /> • Meetings with DNR and NPS to determine feasibility of water access <br /> facilities(permanent or seasonal dockage)at park frontage on the <br /> Mississippi River. <br /> • More detailed docking system analysis and feasibility based on initial <br /> agency feedback. <br /> • Additional meetings with staff,Commissions,or Council <br /> • Engineering support related to civil/storm water,electrical modifications,or <br /> structural design if needed during the design of the final park features. <br /> • Coordination of additional survey related information if deeded required <br /> We look forward to contributing our expertise to this important community project. Please <br /> feel free to contact me with additional questions or if you need clarifications to this proposal. <br /> If you are comfortable with the approach,please sign it and email me a copy at <br /> paul @hkgi.com. We are available to start work on the project within 14 working days,and <br /> anticipate completion of tasks 1 through 6 within 60 days from the start of the project. <br /> Thank you for the opportunity and I look forward to hearing from you. <br /> Sincerely, <br /> Paul E.Paige,RLA <br /> President <br /> Hoisington Koegler Group Inc. <br /> I hereby accept the terms and conditions as outlined in this letter and authorize Hoisington <br /> Koegler Group,Inc.to perform services noted herein. Billings will be sent monthly for <br /> work completed,and payment is expected within 30 days. <br /> Name and Title Date <br /> City of Elk River—Rivers Edge Commons Park Expansion project proposal Nov 2014 3 <br />