My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. PRSR 12-10-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2011-2020
>
2014
>
12-10-2014
>
7.1. PRSR 12-10-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2014 10:42:36 AM
Creation date
12/10/2014 10:42:36 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
12/10/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Potential Additional Services if required <br /> • Meetings with DNR and NPS to determine feasibility of water access <br /> facilities(permanent or seasonal dockage)at park frontage on the <br /> Mississippi River. <br /> • More detailed docking system analysis and feasibility based on initial <br /> agency feedback. <br /> • Additional meetings with staff,Commissions,or Council <br /> • Engineering support related to civil/storm water,electrical modifications,or <br /> structural design if needed during the design of the final park features. <br /> • Coordination of additional survey related information if deeded required <br /> We look forward to contributing our expertise to this important community project. Please <br /> feel free to contact me with additional questions or if you need clarifications to this proposal. <br /> If you are comfortable with the approach,please sign it and email me a copy at <br /> paul @hkgi.com. We are available to start work on the project within 14 working days,and <br /> anticipate completion of tasks 1 through 6 within 60 days from the start of the project. <br /> Thank you for the opportunity and I look forward to hearing from you. <br /> Sincerely, <br /> Paul E.Paige,RLA <br /> President <br /> Hoisington Koegler Group Inc. <br /> I hereby accept the terms and conditions as outlined in this letter and authorize Hoisington <br /> Koegler Group,Inc.to perform services noted herein. Billings will be sent monthly for <br /> work completed,and payment is expected within 30 days. <br /> Name and Title Date <br /> City of Elk River—Rivers Edge Commons Park Expansion project proposal Nov 2014 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.