My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 10-20-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
10-20-2014
>
8.2. SR 10-20-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2014 10:24:46 AM
Creation date
10/17/2014 9:44:06 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/20/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br /> The 2015 Street Improvements include improvements on multiple streets throughout the City. Different <br /> pavement management procedures are proposed to be utilized on each street,depending on the existing <br /> condition of the street.Each street was reviewed by Bolton&Menk and City Staff to determine the <br /> procedure that would be applied to it. Each procedure is described below, along with the street that is <br /> scheduled for that type of procedure. <br /> Edge Mill and Overlay <br /> Edge Mill and Overlay of a roadway consists of milling the existing bituminous along the existing gutter <br /> or bituminous edge in order to match the new overlay to the existing elevations.Areas of roadway will <br /> also be Milled and Overlayed,this consists of milling the existing bituminous surface along the roadway <br /> to a uniform depth and overlaying bituminous on the remaining pavement. The streets proposed to be <br /> edge milled and overlayed are in fair condition.The proposed Edge Mill and Overlay improvements are <br /> shown on Figure No. 1 and 2 in Appendix A. <br /> The following streets are proposed to be edge milled and overlayed: <br /> • School Street NW(Proctor Avenue NW to TH 169) <br /> • 8th Street NW(Dodge Avenue NW to Cul-de-Sac) <br /> • Tyler Street Area— 197th Avenue NW(Evans Street NW to Dodge Street NW), 198th Avenue <br /> NW(Dodge Street NW to Zane Street NW), 197th Avenue NW(Zane Street NW to Tyler Street <br /> NW),200th Avenue NW(Cul-de-Sac to Tyler Street NW),Vance Circle NW,Vance Street NW <br /> (Vance Circle to Ulysses Street NW),Ulysses Street NW(South Cul-de-Sac to 202nd Avenue <br /> NW), 195th Avenue NW(Ulysses Street NW to Tyler Street NW),Tyler Street NW(197th <br /> Avenue NW to 201st Circle NW),201st Circle NW,203rd Avenue NW(Smith Street NW to <br /> 560-feet east of Quincy Circle NW), Quincy Circle NW <br /> Reclamation <br /> Reclaiming of bituminous pavement is a process whereby the pavement and underlying aggregate base <br /> are milled together in-place,regraded and compacted as base material for the new pavement overlay. The <br /> new pavement section shall be a 9-Ton design and shall consist of 3.5-inches of bituminous pavement <br /> with 8-inches of aggregate base. The streets proposed to be reclaimed are in poor condition.The proposed <br /> reclamation improvements are shown on Figure No. 2 in Appendix A. <br /> The following streets are proposed to be reclaimed: <br /> • Elk Hills Area—Elk Hills Drive NW,Fawn Road NW,Line Avenue NW, and 700-feet of Elk <br /> Lane NW beginning at Elk Hills Drive <br /> • Tyler Street Area—Tyler Street NW(Twin Lakes Road to 197th Avenue NW), Smith Street NW <br /> (201 st Circle NW to 205th Avenue NW),202nd Avenue NW(Smith Street NW to Ulysses Street <br /> NW),Ulysses Street NW(202nd Avenue NW to Vance Street NW,Vance Street NW(Vance <br /> Circle NW to 205th Avenue NW) <br /> City of Elk River INTRODUCTION <br /> 2015 Street and Utility Improvements Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.