Laserfiche WebLink
Financial Impact <br /> If the first option is chosen, the amendments to the 171"FAST can be completed by staff and the topic <br /> of roundabouts in this area will be done. <br /> A corridor study, to be completed now, or in the future,would require staff to define a scope and prepare <br /> a request for proposal to hire an outside consultant to complete the analysis. If it is directed to complete <br /> the corridor study at this time, the proposals and associated costs will be brought back for approval of the <br /> Council before the end of the year. <br /> Attachments <br /> ■ Transportation Figure, 1715`FAST <br /> N:\Public Bodies\Agenda Packets\10-20-2014\Final\x8.1 sr TLR Intersections.docx <br />