My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2. SR 09-15-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
09-15-2014
>
7.2. SR 09-15-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2014 10:19:10 AM
Creation date
9/12/2014 9:01:39 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk <br /> River <br /> 13065 Orono Parkwa) <br /> Ilk liver,N1\ 55330 <br /> August 6,2014 <br /> Ralphie's Victory Lane <br /> Brian Brehmer VIA EMAIL: ralphiesvictorylane @gmail.com <br /> 13374 Highway 10 <br /> Elk River,N N 55330 <br /> RE: Comment Letter, <br /> Conditional Use Permit—Carwash in C-3 Zoning District <br /> Dear Mr.Brehmer, <br /> Staff has conducted a review of the materials submitted on July 28,2014. The following comments <br /> and recommendations are intended to bring the property in line with current city requirements and <br /> should be addressed on future plans. <br /> Site Plan <br /> 1. The site is located in the Shoreland Overlay District which limits the amount of <br /> impermeable surfaces that a parcel can have to 25 0/'o of the total lot area. The lot is currently <br /> considered a legal non-conforming use with 82.10/6 impermeable surface. <br /> a. The plan must be amended to show no net increase in impermeable surface. With <br /> the current plan, that will require the removal of approximately 3,050 square feet of <br /> existing pavement. <br /> 2. Please submit a stormwater drainage plan restricting the peak discharge to a rate no greater' <br /> than the five-year peak discharge. To the maximum extent possible, the drainage plan must <br /> also provide for methods to runoff sctticment and/ or filtration proper to discharge to the <br /> receiving water. <br /> a. The recommended method for runoff settlement and/or filtration would be to <br /> construct a rain garden in the southeast section. The basin should be designed for <br /> optimal discharge overflow and settlement and planted with native vegetation. <br /> 3. City ordinance requires B612 concrete curbing around all parking lot and driveways. <br /> Proposed site improvements should include concrete curbing along all parking areas and <br /> driveways east of the entrance drives. <br /> a. Please include curb and gutter beginning at the property line on the east edge of the <br /> south driveway and continue it around to tie into the curbing on the adjacent parcel <br /> to the east. All new drive aisles must include curb and gutter. While required for the <br /> entire site, the curbing note is intended to address the improvement in scale with the <br /> proposed development. <br /> Phone: 763.635.1000 <br /> Fax: 763.635.1090 P 0 N E 8 E 0 B 1 <br /> www.delk-river.mn.us INATUREI <br />
The URL can be used to link to this page
Your browser does not support the video tag.