Laserfiche WebLink
YALE STREET FEASIBILITY <br /> PRELIMINARY COST ESTIMATE <br /> CITY OF ELK RIVER <br /> NO. ITEM UNITS QTY UNIT PRICE TOTAL PRICE <br /> STORM SEWER <br /> 1 REMOVE CULVERT(RCP) LF 120 $10.00 $1,200.00 <br /> 2 CONST DRAINAGE STRUCTURE DESIGN G LF 25 $260.00 $6,500.00 <br /> 3 CONST DRAINAGE STRUCTURE DES 48-4022 LF 80 $250.00 $20,000.00 <br /> 4 CASTINGS EACH 15 $700.00 $10,500.00 <br /> 5 12" RC PIPE CULVERT LF 230 $32.00 $7,360.00 <br /> 6 15" RC PIPE CULVERT LF 1024 $34.00 $34,816.00 <br /> 7 18" RC PIPE CULVERT LF 466 $40.00 $18,640.00 <br /> 8 12" RC PIPE APRON EACH 2 $600.00 $1,200.00 <br /> 9 15" RC PIPE APRON EACH 4 $620.00 $2,480.00 <br /> 10 18" RC PIPE APRON EACH 6 $650.00 $3,900.00 <br /> 11 RANDOM RIPRAP CLASS IV CU YD 88 $80.00 $7,040.00 <br /> 12 STORM DRAIN INLET PROTECTION EACH 15 $150.00 $2,250.00 <br /> SUBTOTAL STORM SEWER COST $115,886.00 <br /> 10%CONTINGENCIES $11,580.00 <br /> TOTAL STORM SEWER COST $127,466.00 <br /> INDIRECT COSTS(15%) $19,150.00 <br /> TOTAL STORM SEWER COST $146,616.00 <br />