My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.7. SR 09-15-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
09-15-2014
>
4.7. SR 09-15-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2014 8:44:58 AM
Creation date
9/12/2014 8:41:23 AM
Metadata
Fields
Template:
City Government
type
SR
date
9/15/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YALE STREET FEASIBILITY <br /> PRELIMINARY COST ESTIMATE <br /> CITY OF ELK RIVER <br /> NO. ITEM UNITS QTY UNIT PRICE TOTAL PRICE <br /> STREETS <br /> 1 MOBILIZATION LS 1.00 $60,000.00 $60,000.00 <br /> 2 TRAFFIC CONTROL LS 1.00 $10,000.00 $10,000.00 <br /> 3 REMOVE CURB AND GUTTER LIN FT 726 $5.00 $3,630.00 <br /> 4 REMOVE BITUMINOUS PAVEMENT SQ YD 11436 $3.00 $34,308.00 <br /> 5 REMOVE LIGHT POLE EACH 8 $200.00 $1,600.00 <br /> 6 SAWING BIT PAVEMENT(FULL DEPTH) LIN FT 1857 $3.00 $5,571.00 <br /> 7 SUBGRADE EXCAVATION CU YD 7000 $7.00 $49,000.00 <br /> 8 COMMON EXCAVATION CU YD 16000 $8.00 $128,000.00 <br /> 9 POND EXCAVATION CU YD 5117 $8.00 $40,936.00 <br /> 10 GRANULAR BORROW CU YD 10000 $5.00 $50,000.00 <br /> 11 AGGREGATE BASE(CV)CLASS 5 TON 8000 $12.00 $96,000.00 <br /> 12 TYPE SP 12.5 WEARING COURSE MIX(4,E) TON 1702 $75.00 $127,650.00 <br /> 13 TYPE SP 12.5 NON WEARING COURSE MIX(4,B) TON 2128 $70.00 $148,960.00 <br /> 14 CONCRETE BLOCK RETAINING WALL SY 40 $250.00 $10,000.00 <br /> 15 4"CONCRETE WALK SQ FT 19600 $4.00 $78,400.00 <br /> 16 CONCRETE CURB&GUTTER DESIGN B618 LIN FT 7400 $12.00 $88,800.00 <br /> 17 COMMON TOPSOIL BORROW CU YD 1500 $20.00 $30,000.00 <br /> 18 SEED, FERTILIZER,&MULCH ACRE 5 $2,000.00 $10,000.00 <br /> 19 SODDING TYPE LAWN SQ YD 3000 $3.50 $10,500.00 <br /> 20 PARKING LOT REMOVE&REPLACE SQ YD 1600 $30.00 $48,000.00 <br /> 21 STRIPING AND SIGNAGE LS 1 $6,000.00 $6,000.00 <br /> SUBTOTAL STREETS COST $1,037,355.00 <br /> 10%CONTINGENCIES $103,730.00 <br /> TOTAL STREETS COST $1,141,085.00 <br /> INDIRECT COSTS(15%) $171,200.00 <br /> TOTAL STREETS COST $1,312,285.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.