Laserfiche WebLink
Sara M., Race, E.I.T., <br /> Design Engineer <br /> Summary <br /> Education Ms.Race joined Bolton&Menk,Inc.in 2013 as a Design Engineer in the <br /> Bachelor of science- Water Resources Group.Her primary responsibilities include identification and <br /> Civil Engineering, discussion of NPDES Phase I and II requirements,hydrologic and hydraulic <br /> University of Minnesota modeling, and identification of alternatives for proposed improvements. Ms. <br /> Race assists project managers in the development of preliminary project costs, <br /> Registration hydraulic and hydrologic design computations for preliminary project layouts, <br /> Engineer-in-Training,Minnesota and development of feasibility reports. She also assists with the design and <br /> preparation of Storm Water Pollution Prevention Plans for a variety of civil <br /> Certifications engineering related construction projects. <br /> U of M Certifications <br /> • SWPPP Design Ms. Race has additional experience with Autodesk Civil 3D design software <br /> • SwPPP site Management and ArcMap 10 analyses. She also has experience in hydraulic design using <br /> HydroCAD,Autodesk Storm and Sanitary Analysis,HEC-HMS,HEC-RAS, <br /> and EPA SWMM. <br /> Experience <br /> Stormwater Management Design <br /> • North Urban Regional Trail, Dakota County, MN <br /> • TH 61 Surface Improvements,White Bear Lake, MnDOT <br /> • Spruce Street Ravine Restoration and Drainage Improvements, City of <br /> Waconia,MN <br /> • Washington County Public Works Facility Improvements,Washington <br /> County, MN <br /> • Letter of Map Amendment, City of New London, MN <br /> 1 <br />