My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 05-05-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
05-05-2014
>
7.1. SR 05-05-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2014 2:58:41 PM
Creation date
5/2/2014 11:53:23 AM
Metadata
Fields
Template:
City Government
type
SR
date
5/5/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
143
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River comprehensive Plan <br />Bicycle and Pedestrian Connections and Crossings <br />In addition to the long -term planned improvements on US 10 and US 169 which <br />include crossings and connections for pedestrians and bicyclists, the City has identified <br />a number of future trails and sidewalks (Figure 6 -7) to address the lack of trails and <br />challenging roadway crossings in some areas of the community. As shown on the map, <br />the recommended trail network is quite extensive and comprehensive. However, there <br />is not any prioritization to the network so it is challenging to identify which segments <br />will provide the most benefit for users and thus should be prioritized for implementation. <br />One of the ways that the City can improve connections and crossings for pedestrians <br />s and bicyclists is to recognize walking and bicycling as a transportation mode as well <br />as a recreational activity. By elevating these facilities as a means of transportation, <br />there are additional opportunities through grants and planning to prioritize connections <br />that serve a transportation or dual purpose. It is recommended that the City's Park, <br />Trails and Open Space Plan identify crossing and connection priorities. Recommended <br />priorities should be based off of criteria developed as part of the process and should be <br />incorporated into both plans. <br />Implementation <br />There are things the City can do on an ongoing basis that will improve conditions for <br />pedestrians and bicyclists and enhance the network. Activities include: <br />Incorporate sidewalk and /or trail provisions as part of the subdivision ordinance and <br />plat review criteria. <br />Incorporate sidewalk and /or trail facilities as part of construction and /or <br />reconstruction on all collector and arterial roadways. <br />Incorporate adequate shoulders on collector and arterial roadways for commuter <br />cyclists. <br />Include American with Disabilities Act improvements when repairing or constructing <br />roadways <br />Incorporate countdown timers and audible commands as part of new traffic signal <br />construction and traffic signal replacement (MnDOT has upgraded most of the traffic <br />signals on its network). <br />Incorporate best design practices for bicycle and pedestrian facilities at intersections <br />and at any mid -block crossings. <br />Consider lighting needs for system users when facilities are developed. <br />Apply for grants to help build the sidewalk and trail network. <br />Work with Sherburne County and MnDOT to implement improvements on their <br />roadway networks. <br />68 / Chapter 6: Transportation <br />
The URL can be used to link to this page
Your browser does not support the video tag.