Laserfiche WebLink
City Council Minutes Page <br />February 9, 2004 <br /> <br /> 15. A TREE PRESERVATION PLAN BE APPROVED PRIOR TO RELEASING <br /> THE PLAT FOR RECORDING. <br /> <br />16. <br /> <br />ANY TREES OFF SITE OR ON SITE, NEAR THE LIMIT OF GRADING THAT <br />ARE TO BE PRESERVED, SHALL BE FENCED WITH A SNOW FENCE AT <br />THE DRIP LINE TO PREVENT GRADING, COMPACTION, OR STORAGE <br />OF EQUIPMENT, DEBRIS OR MATERIALS. STAFF SHALL INSPECT <br />FENCING PRIOR TO CLEARING OR GRADING COMMENCING. <br /> <br />MOTION CARRIED 5-0. <br /> <br />MOVED BY COUNCILMEMBER MOTIN AND SECONDED BY <br />COUNCILMEMBER TVEITE TO APPROVE THE CONDITIONAL USE <br />PERMIT FOR ELK RIDGE CENTER PLANNED UNIT DEVELOPMENT <br />WITH THE FOLLOWING SEVEN CONDITIONS: <br /> <br />1. ALL COMMENTS OF THE CITY ENGINEER BE ADDRESSED. <br /> <br />ADDITIONAL SCREENING BE INCORPORATED INTO THE LANDSCAPE <br />PLAN ALONG IRVING STREET, AROUND THE DRAINAGE POND IN THE <br />SOUTHEAST CORNER OF THE PROJECT AND BETWEEN THE OUTDOOR <br />STORAGE AREA AND HOLT STREET. <br /> <br />o <br /> <br />A LIGHTING PLAN BE PROVIDED SHOWING LOCATION OF LIGHT <br />STANDARDS AND ILLUMINATION LEVELS. IF POSSIBLE, ADDITIONAL <br />LOWER LIGHT POLES SHOULD BE USED INSTEAD OF FEWER TALLER <br />POLES. <br /> <br />4. DESIGN STANDARDS SHALL BE APPROVED BY THE CITY COUNCIL AND <br /> INCORPORATED INTO THE PUD AGREEMENT. <br /> <br />5. SIGN DETAILS BE PROVIDED AND INCORPORATED INTO THE PUD <br /> AGREEMENT. <br /> <br />6. A TRAIL CONNECTION BE INSTALLED ALONG THE SOUTH SIDE OF <br /> THE SOUTH ENTRANCE INTO THE PROJECT. <br /> <br />7. PERMITTED AND CONDITIONAL USES SHALL BE IDENTIFIED AND <br /> INCORPORATED INTO THE PUD AGREEMENT. <br /> <br />MOTION CARRIED 5-0. <br /> <br />6.1 <br /> <br />Request by NRG Energy., Inc. for Conditional Use Permit Renewal for Refuse Derived <br />Resource Recovery Facility. (RDF Plant), Public Hearing - Case No. CU 03-37 <br /> <br />6.2 <br /> <br />Request by Great River Energy. for Conditional Use Permit Renewal for Solid Waste Facility, <br />Public Hearing- Case No. CU 03.38 <br /> <br />Building & Environmental Administrator Stephen Rohlf presented the staff report for these <br />items noting that the permit life has been extended from two years to four years. He <br />explained that the Planning Commission held a Public Hearing and has reviewed the CUP's. <br /> <br /> <br />