My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.11. SR 04-21-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
04-21-2014
>
4.11. SR 04-21-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2014 9:04:03 AM
Creation date
4/18/2014 9:02:16 AM
Metadata
Fields
Template:
City Government
type
SR
date
4/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Justin Femrite, P.E. <br /> OApril 10, 2014 <br /> Page 2 <br /> The selected option for biosolids treatment is to treat biosolids using aerobic treatment and produce a cake <br /> product using screw presses. The existing anaerobic digesters will be redesigned as aerobic digesters and <br /> the existing biosolids storage tanks will be converted to aerobic storage. The liquid product will be <br /> pumped to a building housing the screw presses where the biosolids will be dewatered and the City will <br /> land apply the cake product to their existing land application sites or landfill the cake product. The <br /> additional costs associated with the revised biosolids option are detailed below. <br /> Cost Estimate and Fees for Revised Biosolids Scope <br /> Item Cost <br /> Site Work $100,000 <br /> Site Piping $100,000 <br /> Building $615,000 <br /> Pumps/Piping $150,000 <br /> Dewatering Equipment $915,000 <br /> Sludge Batch Tank $50,000 <br /> Conveying Systems $50,000 <br /> Mechanical $200,000 <br /> Electrical $200,000 <br /> Total Construction Cost $2,380,000 <br /> Contingency $238,000 <br /> Engineering Fee $343,845 <br /> Less Engineering Fee Per Contract ($82,045) <br /> Additional Engineering Fee $261,800 <br /> Total Project Cost $2,879,800 <br /> As shown above, the additional engineering fee is $261,800. This will cover both the design and <br /> construction phases of the project. These additional fees have been included in previous cost estimates <br /> for the revised scope project. <br /> We appreciate your consideration of our request. If you have any questions regarding any of the above <br /> please do not hesitate to give me a call. <br /> Sincerely, <br /> BOLTON&MENK, INC. <br /> Seth A.Peterson, E. <br /> Principal Engineer <br /> G:\Elk River\T21106811\1_CorresVemrite ltr 10apr2014.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.