Laserfiche WebLink
ELK RIVER ICE ARENA-ICE SYSTEM EVALUATION AND RECOMMENDATIONS <br /> Summary of Ice System Replacement Options: <br /> Table 4. Ice System Options-Cost Estimate Summary <br /> Gosh 1ce'` rn <br /> Ian Go.rfba <br /> nw�d ytem <br /> 4 to <br /> Conu�rsiof IU v� „ IU ti „ than �,,, I�Frase 2,,, <br /> Ex. R-22,,,, ,., New HFC Ammonia,,, ,, ,,,CO2,,,,,,, ,,,,,,,,,, <br /> Refrigerant type Ammonia Ammonia <br /> Grade of System Industrial Industrial Industrial Commercial Industrial Industrial <br /> Removal&reinstall $30,000 $30,000 $30,000 $30,000 $30,000 $30,000 <br /> existing dasher boards <br /> Demolition of existing $10,000 $25,000 $25,000 $25,000 $25,000 $15,000 <br /> refrigeration system <br /> Demolition of existing $60,000 $60,000 $60,000 $60,000 $20,000 $60,000 <br /> conc. ice rink floor <br /> Replace mechanical N/A N/A $25,000 $25,000 $30,000 N/A <br /> ventilation system <br /> New exterior door and N/A N/A $20,000 $20,000 N/A N/A <br /> concrete stoop <br /> Repairs to Ex.System $5,000 N/A N/A N/A N/A N/A <br /> (From Table 2) <br /> Other repairs to existing Not included N/A N/A N/A N/A N/A <br /> system(Table3) See Table 3 <br /> Expand refrigeration $70,000 $70,000 $70,000 $70,000 N/A N/A <br /> room approx.200 SF <br /> New refrigeration $225,000 $475,000 $575,000 $725,000 $775,000 $180,000 <br /> system or equipment <br /> New concrete Ice rink N/A $350,000 $350,000 $475,000 $420,000 $338,000 <br /> floor&subfloor <br /> New snow melt pit heat N/A N/A N/A N/A $75,000 N/A <br /> recovery system Size of future <br /> Additional heat reclaim Not included Not included Not included Not included Not included Not included <br /> systems See Table 3 See Table 3 See Table 3 See Table 3 See Table 3 See Table 3 <br /> Subtotal of estimated $400,000 $1,010,000 $1,155,000 $1,430,000 $1,375,000 $623,000 <br /> construction costs <br /> Estimate,design and $60,000 $151,500 $173,000 $214,500 $206,300 $93,500 <br /> constr.Contingency <br /> (15%)1 <br /> Total estimated $460,000 $1,161,500 $1,328,000 $1,644,500 $1,581,300 $716,500 <br /> construction costs <br /> Engineering, legal,and $55,200 $139,500 $159,400 $197,500 $189,800 $86,000 <br /> administrative(12%)1 <br /> Total estimated project $515,200 $1,301,000 $1,487,400 $1,842,000 $1,771,100 $802,500 <br /> cost <br /> Expected Useful Life- 15-25 25-30 25-30 TBD 25-30 25-30 <br /> Refrig System(yrs) <br /> Expected Useful Life- 40-50 40-50 40-50 TBD 40-50 40-50 <br /> Rink Floor(yrs) <br /> 1. See explanation in Section 2 of this report. <br /> PIStevens 23 <br />