My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.4. ICESR 04-08-2014
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2010-2019
>
2014
>
04-08-2014
>
7.4. ICESR 04-08-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2014 2:33:11 PM
Creation date
4/4/2014 2:33:10 PM
Metadata
Fields
Template:
City Government
type
ICESR
date
4/8/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER ICE ARENA—ICE SYSTEM EVALUATION AND RECOMMENDATIONS <br /> The one disadvantage of a common system is that if a major <br /> problem occurs with the refrigeration system, both ice sheets �,, <br /> are down. However, most equipment and systems have %����� � <br /> backups, minimizing the chance that a total system failure will <br /> occu r. ' <br /> A common ice system could be installed in phases as described <br /> below: <br /> I <br /> Phase 1 includes the replaced of the existing ice rink floor and Photo P-4: The City of Alexandria insta I I ed a <br /> new industrial grade common refrigeration <br /> refrigeration system in the Rink 2 since the existing refrigeration system(for 2 rinks)in 2009 as discussed in <br /> room is likely large enough for the common system. At that Option 7. The system currently operates <br /> time the refrigeration system would be designed and installed one ice rink but is designed to connect a <br /> second ice rink in the future. <br /> with the capacity and accommodations to connect to Rink 2 at <br /> some point in the future. The existing ice rink floor in Rink 2 <br /> would be replaced with a concrete rink floor of the same size. A <br /> new mechanical ventilation system and refrigerant leak <br /> detection system would be installed to meet code <br /> requirements. <br /> The R-22 refrigerant that is salvaged from Rink 2 can be used in <br /> the refrigeration system for Rink 1 alleviating some concerns for <br /> an R-22 shortage in the future. <br /> Phase 2 includes installing the final compressor(s), pump(s), <br /> piping and controls to serve Rink 1, replacing the existing ice <br /> rink floor with a concrete rink floor, and change over the snow <br /> melt system to use waste heat from the refrigeration system. <br /> The cost estimates presented in the following table for Option 8 <br /> are shown in two phases as described above and include the <br /> complete replacement of both ice systems including <br /> refrigeration systems and ice rink floors. <br /> The cost estimates do not include the following items: <br /> • Building a new refrigeration room for a common <br /> refrigeration system to serve both rinks. <br /> • Improvements to the Rink 2 refrigeration system to <br /> keep it operating. <br /> • Expanding the length of the ice rink floor in Rink 1 from <br /> 185'to 200'. This would require a building expansion. <br /> • Reducing the size of the ice rink floor in Rink 2 from <br /> Olympic to NHL size and expanding the bleachers. <br /> 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.