Laserfiche WebLink
Phase 2 Preliminary Cost Estimate <br />Item <br />Description <br />Unit <br />9t j. <br />Unit Cost <br />Total Cost <br />Total <br />$ <br />252,780.00 <br />Contingency (20 %) <br />$ <br />50,556.00 <br />SITE WORK <br />$ 24,900.00 <br />303,336.00 <br />Mobilization <br />LS <br />1 <br />$ 16,600.00 <br />$ 16,600.00 <br />Staking and Layout <br />LS <br />1 <br />$ 8,300.00 <br />$ 8,300.00 <br />STRUCTURE <br />$ 100,000.00 <br />Overlooks <br />EA <br />2 <br />$ 50,000.00 <br />$ 100,000.00 <br />HARDSCAPE <br />$ 19,400.00 <br />8' Wide Ag -Lime Trail <br />CY <br />440 <br />$ 10.00 <br />$ 4,400.00 <br />Miscelleanous <br />LS <br />1 <br />$ 15,000.00 <br />$ 15,000.00 <br />SOFTSCAPE <br />$ 85,500.00 <br />Zone A <br />AC <br />14 <br />$ 1,500.00 <br />$ 21,000.00 <br />Zone B <br />AC <br />11 <br />$ 1,500.00 <br />$ 16,500.00 <br />Zone C <br />AC <br />5.5 <br />$ 1,500.00 <br />$ 8,250.00 <br />Zone D <br />1 " Bare Root and 5' Ht Evergreen <br />EA <br />330 <br />$ 75.00 <br />$ 24,750.00 <br />Miscellaneous <br />LS <br />1 <br />$ 15,000.00 <br />$ 15,000.00 <br />Subtotal <br />$ <br />229,800.00 <br />Soft Cost (10 %) <br />$ <br />22,980.00 <br />Total <br />$ <br />252,780.00 <br />Contingency (20 %) <br />$ <br />50,556.00 <br />$ <br />303,336.00 <br />Elk Ricer Landfill End Use Master Plan 32 URS <br />Waste Management. Inc. September 2002 <br />