Laserfiche WebLink
Approval of the Conditional Use Permit for the expansion of Elk River Ford with the following <br /> conditions: <br /> 1. All comments of the City Engineer shall be addressed. <br /> 2. The project will be completed in phases. <br /> • Phase one will include all the site work including all paving and curbing, removing <br /> the Highway 10 access and constructing the two new access drives; stormwater <br /> ponding; signage; construction of the service addition on the south side of the <br /> building, and construction of the carwash/detail center. <br /> • Phase two will include the additional office space and showroom. <br /> • Phase three will include the parts area and service addition. <br /> 3. The area included in phase two and three shall be graded and seeded;no parking will be <br /> allowed in this area. <br /> 4. Since the project is proposed to be completed in phases,the approval for the conditional use <br /> permit shall be extended to 2010. <br /> 5. The existing access from Highway 10 shall be removed. <br /> 6. Because the applicant is proposing to utilize Low Impact Design techniques to manage <br /> stormwater, curb and gutter will only be installed in areas to control runoff and customer <br /> traffic. <br /> 7. The existing home shall be removed. <br /> 8. Per Sec. 30- 859 no signage and/or decorations of any type, such as but not limited to, <br /> banners,pennants, festoons,painted windows and balloons shall be allowed on the vehicles. <br /> No temporary signs shall be allowed except as permitted under Sec.30-866(7) <br /> 9. A letter of credit in the amount of$50,000 shall be provided prior to issuing the grading or <br /> building permits. <br /> 10. There shall be a minimum classification of semi-cutoff lighting fixtures installed. <br /> Council Action Motion by Second by Vote <br /> Follow Up <br /> C:\Users\jbarnhart\Desktop\Park dedication issue 2014\1`06-06 Staff report to CC 4-17.doc <br />