My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.1. SR 02-03-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
02-03-2014
>
9.1. SR 02-03-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2014 8:53:24 AM
Creation date
1/31/2014 8:39:17 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/3/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission/P 06-06 <br /> April 11,2006 <br /> Page 7 <br /> A and B shall be paid at the time those lots are platted and at the rate applicable at <br /> the time they are granted final plat approval. <br /> 4. Surface water management fee, at the rate applicable at the time of final plat, shall be <br /> paid for Lot 1 (17.73 ac.) prior to releasing the plat for recording. Surface water <br /> management fee for Oudots A and B shall be paid at the time those lots are platted <br /> and at the rate applicable at the time they are granted final plat approval. <br /> 5. The preliminary plat approval shall be extended for 3 years from the date that the <br /> Council grants final plat approval. <br /> Conditional Use Permit <br /> Staff recommends that the Planning Commission recommend approval of the conditional <br /> use permit to expand the dealership with the following conditions: <br /> 1. All comments of the City Engineer shall be addressed. <br /> 2. The project will be completed in phases. <br /> • Phase one will include all the site work including all paving and curbing, <br /> removing the Highway 10 access and constructing the two new access drives; <br /> stormwater ponding; signage; construction of the service addition on the <br /> south side of the building,and construction of the carwash/detail center. <br /> • Phase two will include the additional office space and showroom. <br /> • Phase three will include the parts area and service addition. <br /> 3. The area included in phase two and three shall be graded and seeded;no parking will <br /> be allowed in this area. <br /> 4. Since the project is proposed to be completed in phases,the approval for the <br /> conditional use permit shall be extended to 2010. <br /> 5. The existing access from Highway 10 shall be removed. <br /> 6. Because the applicant is proposing to utilize Low Impact Design techniques to <br /> manage stormwater, curb and gutter will only be installed in areas to control runoff <br /> and customer traffic. <br /> 7. The existing home shall be removed. <br /> 8. Per Sec. 30- 859 no signage and/or decorations of any type, such as but not limited <br /> to, banners,pennants, festoons,painted windows and balloons shall be allowed on <br /> the vehicles. No temporary signs shall be allowed except as permitted under <br /> Sec.30-866(7) <br /> 9. A letter of credit in the amount of$50,000 shall be provided prior to issuing the <br /> grading or building permits. <br /> C:\Users\jbarnhart\Desktop\Park dedication issue 2014\P 06-06PC4-11.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.