My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.3. SR 01-21-2014
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2014
>
01-21-2014
>
7.3. SR 01-21-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/17/2014 11:06:05 AM
Creation date
1/17/2014 10:08:44 AM
Metadata
Fields
Template:
City Government
type
SR
date
1/21/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
standards and will comply with the stricter nighttime standards during the period from <br /> 10:00 p.m.to 7:00 a.m. as defined by MN Rules Chapter 7030, Noise Pollution Control. <br /> 4. Revise reclamation grades to accommodate future 221St Avenue NW realignment and <br /> construction of a grade separated interchange; <br /> The Minnesota Department of Transportation (MnDOT) has studied the US 169 corridor and <br /> identified various corridor improvements including <br /> an underpass at 145th Street and associated local <br /> frontage road alignments. Plans have not been <br /> approved at this point but preliminary design is <br /> available. Reclamation grades have been revised <br /> to reflect the new interchange, new road <br /> alignments and potential grades. - <br /> 5. Document that the northern portion of the permit <br /> area has been sold by Tiller to the Elk River Landfill " <br /> and the subsequent adjustment of our reclamation grades to conform to that sale; <br /> Tiller will continue to mine the northern portion of the permit area that was sold to Elk River <br /> Landfill under a lease agreement with the Elk River Landfill. Mining will be in advancement <br /> of the Elk River Landfill phasing. Once mining advances from the Elk River Landfill onto Tiller <br /> property, mining will continue in a southerly direction <br /> II.SITE INFORMATION <br /> 1. Legal Description <br /> See Appendix 1, Legal Descriptions <br /> 2. Name and Address of Applicant and Land Owner: <br /> Applicant: Tiller Corporation <br /> 7200 Hemlock Lane, Suite 200 <br /> P.O. Box 1480 <br /> Maple Grove, MN 55311-6480 <br /> Contact Mike Caron: (763)425-4191 <br /> Land Owners: Tiller Corporation (See address above) <br /> Elk River Landfill <br /> Elk River Landfill, Inc. <br /> 22460 Hwy 169 NW <br /> Elk River, MN 55330 <br /> Contact: Debra Dehn (612)441-2464 <br /> Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.