Laserfiche WebLink
Elk River Entry Sign <br />Preliminary Cost Estimates <br /> <br />Option A <br /> <br />Common Excavation <br />Foundation - piers with a grade beam <br />Cast in place concrete backdrop <br />Painted metal lettering and logo <br />Stone clad pier with precast cap <br />(3) uplights <br />Planting <br /> <br />Subtotal <br />10% Contingency <br /> <br />Total Preliminary Cost Estimate - Qption A <br /> <br />Option B <br /> <br />Common Excavation <br />Foundation - piers with a grade beam <br />Cast in place concrete backdrop <br />Painted metal lettering and logo <br />Stone clad pier with precast cap <br />(3) uplights <br />Dry laid boulder wall <br />Planting <br /> <br />Subtotal <br />10% Contingency <br /> <br /> $900.00 <br />$2,4O0.00 <br />$4,100.00 <br />$3,80O.00 <br />$2,850.0O <br />$1,400.00 <br />$1,800.00 <br /> <br /> $900.00 <br />$2,400.OO <br />$4,65O.OO <br />$3,800.0O <br />$3,050.00 <br />$1,400.00 <br />$1,35O.OO <br />$1,625.O0 <br /> <br />10/5/98 <br /> <br />$17,250.00 <br />$1,725.OO <br /> <br />$18,975.00 <br /> <br />$19,175.00 <br />$1,917.50 <br /> <br />Total Preliminary Cost Estimate - Option B $21,092.50 <br /> <br /> <br />