My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HANDOUTS JT HR CC MTG 11042013
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2010-2019
>
2013
>
11-04-2013 Spec Jnt CC
>
HANDOUTS JT HR CC MTG 11042013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2013 2:47:36 PM
Creation date
11/12/2013 2:47:35 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
11/4/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONCLUSIONS AND RECOMMENDATIONS <br /> area. We expect the project to have strong initial market acceptance and excellent long-term <br /> performance;however,this will not be at the expense of existing affordable facilities in the <br /> PMA. <br /> Projected Absorption <br /> Based on a review of the development concept,an assessment of the Site and location,and <br /> lack of competitive product,we believe that the proposed project will be very successful and <br /> should experience a relatively fast absorption rate. <br /> Because Blackhawk Woods is a townhome concept with buildings ranging from five to eight <br /> units,the project has the potential to be phased as construction is completed. However,for <br /> purposes of our analysis we assume the construction of all units will be completed <br /> simultaneously providing economies of scale for construction costs. <br /> Other affordable cottage-style senior developments in the Twin Cities have absorbed very <br /> quickly. In fact,some of those projects were over 90%leased at the time of occupancy. Many <br /> of these developments were constructed in the early-to-mid 1990s. Based on the <br /> demographic trends,the current rental market situation,and the proposed development <br /> concept,we estimate that 84-units would be 40%pre-leased at'initial occupancy. We project <br /> that the remaining 50 units should lease at a rate of between four to six units per month to <br /> reach stabilized occupancy(95%)within approximately eight to twelve months. <br /> This projected absorption period assumes that a professional marketing campaign is <br /> undertaken and initial occupancy is between spring and summer. Should the project <br /> open in late fall or the winter months,the lease-up period would be extended. <br /> MAXFIELD RESEARCH INC. 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.