My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 11-04-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
11-04-2013
>
8.1. SR 11-04-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2013 2:54:41 PM
Creation date
11/1/2013 10:09:46 AM
Metadata
Fields
Template:
City Government
type
SR
date
11/4/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maintenance Memorandum. However,it is not reference in the City's Ordinance. The Deputy Director of Community <br /> Operation and Development will work with the City Engineer to draft this amendment using the MPCA model ECS <br /> ordinance as a guideline. The amended ordinances will be place on the City Council's meeting agenda for approval <br /> within 12 months following the date permit coverage is extended. <br /> C. (3.), (8.), are addressed in the Construction Erosion and sediment control checklist in Appendix D of the SWPPP. <br /> However, they are not reference in the City's Ordinance. Following the same procedures as for(1), the ordinance will <br /> be amended to include the use of BMPs for dewatering activities and criteria for use of temporary sediment basins. <br /> Post-construction stormwater management <br /> A. Do you have a regulatory mechanism(s)to address post-construction stormwater management activities? <br /> ®Yes ❑ No <br /> 1. If yes: <br /> a. Check which type of regulatory mechanism(s)your organization has (check all that apply): <br /> ® Ordinance ❑ Contract language <br /> ® Policy/Standards ❑ Permits <br /> ❑ Rules <br /> ❑ Other, explain: <br /> b. Provide either a direct link to the mechanism selected above or attach it as an electronic document to this <br /> form; or if your regulatory mechanism is either an Ordinance or a Rule, you may provide a citation: <br /> Citation: <br /> City Code:Sec. 30-416. Excavation, grading and erosion control. <br /> City Code:Sec. 30-2175. Post construction stormwater management <br /> City of Elk River Design Standards <br /> Direct link: <br /> http://library.municode.comlindex.aspx?clientld=13427&stateld=23&stateName=Minnesota <br /> ❑ Check here if attaching an electronic copy of your regulatory mechanism,with the following file naming <br /> convention: MS4NameHere PostCSWreg. <br /> B. Answer yes or no below to indicate whether you have a regulatory mechanism(s)in place that meets the following <br /> requirements as described in the Permit(Part III.D.5.a.): <br /> 1. Site plan review: Requirements that owners and/or operators of construction activity submit ®Yes ❑ No <br /> site plans with post-construction stormwater management BMPs to the permittee for review and <br /> approval, prior to start of construction activity. <br /> 2. Conditions for post construction stormwater management: Requires the use of any <br /> combination of BMPs,with highest preference given to Green Infrastructure techniques and <br /> practices (e.g., infiltration, evapotranspiration, reuse/harvesting, conservation design, urban <br /> forestry, green roofs, etc.), necessary to meet the following conditions on the site of a <br /> construction activity to the Maximum Extent Practicable (MEP): <br /> a. For new development projects—no net increase from pre-project conditions (on an annual ❑ Yes ® No <br /> average basis)of: <br /> 1) Stormwater discharge volume, unless precluded by the stormwater management <br /> limitations in the Permit(Part III.D.5.a(3)(a)). <br /> 2) Stormwater discharges of Total Suspended Solids(TSS). <br /> 3) Stormwater discharges of Total Phosphorus (TP). <br /> b. For redevelopment projects—a net reduction from pre-project conditions (on an annual ❑ Yes ® No <br /> average basis)of: <br /> 1) Stormwater discharge volume, unless precluded by the stormwater management <br /> limitations in the Permit(Part III.D.5.a(3)(a)). <br /> 2) Stormwater discharges of TSS. <br /> 3) Stormwater discharges of TP. <br /> 3. Stormwater management limitations and exceptions: <br /> a. Limitations <br /> 1) Prohibit the use of infiltration techniques to achieve the conditions for post-construction ❑ Yes ® No <br /> stormwater management in the Permit(Part III.D.5.a(2))when the infiltration structural <br /> stormwater BMP will receive discharges from,or be constructed in areas: <br /> a) Where industrial facilities are not authorized to infiltrate industrial stormwater under <br /> www.pca.state.mn.us 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats <br /> wq-strm4-49a • 5131113 Page 5 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.