My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ICESR HANDOUT 11-06-2003
ElkRiver
>
City Government
>
Boards and Commissions
>
Arena Commission
>
ICE Packets
>
2000-2009
>
2003
>
11-06-2003
>
ICESR HANDOUT 11-06-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2013 10:39:59 AM
Creation date
10/25/2013 10:39:59 AM
Metadata
Fields
Template:
City Government
type
ICESR
date
11/6/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> star <br /> STEVENS <br /> ENGINEERS <br /> November 6,2003 <br /> Mayor and City Council Members <br /> City of Elk River <br /> 13065 Orono Pkwy <br /> Elk River, MN 55330-5600 <br /> RE: Ice Rink Dasher Board Replacement Project-Bid Results <br /> Our File No.6008 <br /> Dear Mayor and City Council Members: <br /> On Thursday,-October 30, 2003 bids were opened for the Ice Rink Dasher Board Replacement Project, <br /> The low bid was $81,884.00 submitted by Commercial Refrigeration Systems located in Virginia, <br /> Minnesota. The bid are summarized below along with the engineer's estimate. <br /> Bidder Base Bid Alternate 1 <br /> Commercial Refrigeration Systems $81,884.00 $3,900.00 <br /> Athletics $109,340.00 ($4,685.00) <br /> Engineer's Estimate • $102,500.00 $0.00 <br /> Alternate Bid 1 -Change project schedule to May 5, 2004 through August 23, 2004 <br /> The spread between the two bids is not unusual in the dasher board industry. Both contractors were <br /> interviewed after the bid opening to discuss their bids. Factors that gave Commercial Refrigeration <br /> Systems the advantage over Athletica included the reuse of the existing gate sections,no travel expense, <br /> and their ability to build the steel frames for the player's box more efficiently. Commercial Refrigeration <br /> Systems is using Becker Arena Products as their subcontractor. Becker Arena Products is well <br /> respected in the dasher board industry. <br /> The low bid is substantially lower than the engineers estimate for some of the reason discussed above. <br /> The engineer's estimate was prepared.prior to opening the bids and is based on final plans. <br /> We have reviewed the bids and recommend awarding the contract to the low bidder Commercial <br /> Refrigeration Systems on the condition that the contrectorwill execute the contract documents and <br /> return them to the City within ten(10) days in conformance with the bidding documents. <br /> 1656 Livingstone Road •Hudson, WI 54016 <br /> 715-386-5619 • 651-436-2075• 800-622-7670 •fax: 715-386.5879 •www.stevensengineera.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.