My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMUSR MICS.ITEMS 11-12-2003
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2003
>
11-12-2003
>
ERMUSR MICS.ITEMS 11-12-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2013 11:40:19 AM
Creation date
10/16/2013 11:40:18 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/12/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northern group eyes Ian M.idpY UMW*May Mpf WYtl Tebbe.nwpt As part of its fact-finding <br /> process, Fosston Public Works <br /> renewable generation a Director Dave Larson, Assistant <br /> Public Works Director Dean De- <br /> with enviable record I frang, Darryl Tveitbakk and Da- <br /> 1 m i 1 lene Monsebroten of the North- <br /> 1 i—,� ern Municipal Power Agency, <br /> What started as a wastewater <br /> I i and Al Tschepen of Minnkota <br /> treatment project for Fosston Power Cooperative Sept. 19 <br /> Municipal Utilities may lead to - riII I11I1II!ww iVmom I toured a methane-fueled genera- <br /> an electrical generation project. i, I <br /> A local agricultural processor r1'n t I J lion project owned by Elk River <br /> �1Jf1,1 ills rin IilliE��i'1,'i'� Municipal Utilities. <br /> is the city's largest wastewater �........,.� That facility is fueled by <br /> customer. Its discharge is high in methane collected at a landfill. <br /> biochemical oxygen demand and Elk Myer Iltwelelpal Utilities May 2003 LP)Oi""°"output Three 800 kilowatt dieseleneines <br /> total suspended solids. That led IS run continuously at the facility, <br /> to issues with the city's waste- providing enough electricity to <br /> water lagoons and discussions a. power 1,600 enough elec5riper percent <br /> with the Minnesota Pollution power 1,600 homes, 15 percent <br /> rr of Elk River's needs. <br /> Control Agency. The city had to ..'1' �I i There is room for a fourth en- <br /> find a way to effectively deal ! I gine at the landfill power plant. <br /> with the wastewater load.Adding I,,. C The utility is attempting to get a <br /> an anaerobic pre-treatment 1 ' permit to add the additional gen- <br /> process to the wastewater process „ • i — I eration. The fourth engine will <br /> was part of the answer. 1 i also push the plant from the <br /> While improving the waste- `minor' source category to <br /> water process, the pre-treatment j `major.' The permit fee may <br /> led to the production of make the project uneconomic. <br /> methane–another pollutant to be n."......""1” The city also wheels power for <br /> dealt with. measured, and flared off. Once al plant's process. Or, it may a 660 kilowatt wind turbine. The <br /> The pre-treatment project is engineers have a handle on how make sense to burn it in an engine initial cost of each engine and the <br /> largely complete, at a cost of ap- much methane is produced, fur- to spin a generator and make wind turbine were all roughly <br /> proximately$2.3 million. For the ther questions can be answered. electricity. Or, there may be $1,000 per kilowatt. However, <br /> next six to 12 months,the amount It may make sense to burn the enough methane to do both. the capacity factor of the wind <br /> of methane produced will be methane as part of the agricultur- generation is 18 percent, while <br /> the landfill plant is 97 percent. <br /> The engines chum out approxi- <br /> mately 20 million kilowatt-hours <br /> annually while the wind turbine <br /> produces I million. <br /> The fuel costs for each type of <br /> generation, from an environmen- <br /> tal perspective, are zero. Mainte- <br /> nance costs are equivalent The <br /> wind generator displaces an esti- <br /> mated 520 tons of coal, the land- <br /> fill gas generation 7,884 tons. <br /> The governmental subsidy is <br /> $0.032 per KWH for the wind <br /> generator, $0.00 for the landfill <br /> gas generation. <br />
The URL can be used to link to this page
Your browser does not support the video tag.