Laserfiche WebLink
AiH <br /> Howard R. Green Company <br /> May 19, 2003 <br /> File: 818980J-0060 <br /> Mr. Bryan Adams <br /> General Manager <br /> Elk River Municipal Utilities <br /> 322 King Avenue <br /> Elk River, MN 55330 <br /> RE: 2003 PAVEMENT REHABILITATION IMPROVEMENT <br /> WATERMAIN COSTS <br /> Dear Mr. Adams: <br /> Attached is a copy of the final bid tabulation for the 2003 Street Rehabilitation project. As you can see <br /> from this bid tabulation, Barbarossa & Sons, Inc., was the low bidder on the project in the amount of <br /> $1,093,249.20. The watermain portion of the project has been broken out in individual schedules by <br /> street. The total construction cost for these five different streets is $252,649.00. As we discussed at <br /> our meeting on December 5, 2002, we have also calculated a percentage of mobilization for the <br /> watermain construction. The total mobilization bid was $28,000.00. The watermain construction <br /> resulted in 23.72 percent of the total construction costs. Therefore, the additional charge for <br /> mobilization is $6,641.60 for a total construction cost of$259,290.60. Engineering costs to date, as a <br /> percentage of construction, were just over 10 percent. Therefore, we are including 10 percent <br /> engineering in the amount of $25,929.06 for a total construction cost and engineering through the <br /> bidding stage of$285,219.66. <br /> At the meeting between you, Pat Klaers, Lori Johnson and me on December 5, 2002, you indicated <br /> that you would prefer that construction staking, inspection, and administration be billed directly to the <br /> Elk River Municipal Utilities rather than through the City. Therefore, we will open separate job <br /> numbers for each of these field activities billed directly to you for watermain related issues. <br /> In conclusion, it is the City's intent to award this project to Barbarossa & Sons, Inc., on May 27, 2003. <br /> We anticipate the contractor will begin sometime in early June. We assume that the Elk River <br /> Municipal Utilities will reimburse the City $285,219.66 as detailed above and will pay for field services <br /> directly to Howard R. Green Company. If the Elk River Municipal Utilities disagrees with any of this <br /> information, please contact Lori Johnson or me immediately. <br /> Sincerely, <br /> Howard R. Green Company <br /> Terry J. Maurer, P.E. <br /> TJM:sw <br /> Enclosure <br /> Cc: Lori Johnson, Finance Director <br /> Pat Klaers, City Administrator <br /> Ltr-051903-Adams <br /> 1326 Energy Park Drive • St. Paul, MN 55108 • 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br />