My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.2. SR 08-19-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
08-19-2013
>
8.2. SR 08-19-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2013 9:16:04 AM
Creation date
8/16/2013 9:14:14 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/19/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Edward Youngquist <br /> Water Resources Engineering Specialist <br /> • St. Albans/Arundel Infiltration Project, St. Paul, MN <br /> • Victoria Street Infiltration Project, St. Paul, MN <br /> • Phosphorous Reduction - WWTF Expansion Project, Princeton, MN <br /> • Crystal Lake Flocculation Treatment System, Robbinsdale, MN <br /> Street Construction Experience <br /> • Design for grading and street and utility plans for a broad range of <br /> public and private sector site development and street <br /> reconstruction projects <br /> • Develop construction staging plans for: <br /> - TH 169/Cedar Avenue Bridge Project <br /> - 1-35E/1-694 Weave Project <br /> • Develop project specifications for a variety of public and private <br /> sector reconstruction, utility, and grading projects <br /> • Manage construction administration for municipal and developer <br /> construction and reconstruction projects <br /> • Design for SWPPP and MPCA permits for various reconstruction <br /> projects <br /> • Establish and implement CADD draft standards and manage the <br /> quality control to ensure their use <br /> A <br /> WSB <br />
The URL can be used to link to this page
Your browser does not support the video tag.