Laserfiche WebLink
e) <br /> <br />£) <br /> <br />h) <br /> <br /> City's share is 50 percent. State's share is <br /> 50 percent. <br /> <br /> Trunk Highway No. 169 at 197~h Avenue <br /> Northwest. Install LED signal indications. <br /> Estimated Construction Cost is $15,510.00. <br /> City's share is 50 percent. State's share is <br /> 50 percent. <br /> <br /> Trunk Highway No. 169 at Jackson Road <br /> Northwest - 193rd Avenue Northwest. Install <br /> EVP System and LED signal indications. <br /> Estimated Construction Cost is $33,919.00. <br /> City's share is 50 percent. State's share is <br /> 50 percent. <br /> <br />Trunk Highway No. 169 at School Street <br />Northwest - Elk Hills Drive. Install EVP <br />System and LED signal indications. Estimated <br />Construction Cost is $30,919.00. City's <br />share is 50 percent. State's share is <br /> <br />50 percent. <br /> <br />Trunk Highway No. 169 at Main Street - <br /> <br />Nowthen Road. Install EVP System and LED <br /> <br />signal indications. <br />Cost is $33,919.00. <br /> <br />50 percent. <br /> <br /> Estimated Construction <br /> <br />City's share is <br />State's share is 50 percent. <br /> <br />77895R <br /> --4-- <br /> <br /> <br />