Laserfiche WebLink
3. The City with its own forces and equipment or by <br />contract shall perform the EVP System work and the LED signal <br />indication work provided for under State Project No.'s 7102-97 <br /> <br />and 7106-63 with the Construction Costs shared as follows: <br /> a) Trunk Highway No. 10 at Main Street. <br /> <br />c) <br /> <br /> Install <br /> <br /> EVP System and LED signal indications. <br /> <br /> Estimated Construction Cost is $31,515.00. <br /> City's share is 50 percent. State's share is <br /> 50 percent. <br /> <br /> Trunk Highway No. 10 at Jackson Avenue. <br /> Install EVP System and LED signal <br /> indications. Estimated Construction Cost is <br /> $28,369.00. City's share is 50 percent. <br /> State's share is 50 percent. <br /> <br />Trunk Highway No. 10 at County State Aid <br />Highway No. 1 (Proctor Avenue Northwest) - <br />Proctor Avenue Northwest. Install EVP System <br />and LED signal indications. Estimated <br />Construction Cost is $31,369.00. City's <br />share is 50 percent. State's share is <br /> <br />50 percent. <br /> <br />Trunk Highway No. 10 at Joplin Street <br />Northwest. Install LED signal indications. <br />Estimated Construction Cost is $15,088.00. <br /> <br />77895R <br /> --3-- <br /> <br /> <br />