My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1. ERMUSR 05-14-2013
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2003-2013
>
2013
>
05-14-2013
>
6.1. ERMUSR 05-14-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2013 9:09:31 AM
Creation date
5/30/2013 10:55:25 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/14/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Elk River �. <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Wade Lovelette—Superintendent of Technical <br /> John Dietz—Chair Services <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> May 14, 2013 6.1 <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> The Locating department had a total of 314 locate tickets for the month of April; five of them <br /> being emergency tickets, three cancelations, three meets, 288 normal, 14 updated tickets and one <br /> non-excavation. This is over four times as many locate tickets as last month. <br /> Jeff continues using the infrared camera in the field to see if there are any hot spots on our <br /> system that need immediate attention. <br /> In April, the Security Systems Department had a total of 82 phone contacts, 13 systems quoted, <br /> eight system sales made, 10 installs completed, 27 service calls and 13 personal visits. <br /> Meter Technicians continue with the meter reading, power bill, substation checks and off-peak <br /> issues. They continue to change out the three phase meters to radio read meters. <br /> The power plant staff did WEB deflections of the generators. WEB deflection helps determine <br /> the state of crankshaft alignment. Even a few mils variation is indicative of trouble. <br /> Manufacturers recommend checking this periodically, and re-aligning the shaft if the deflection <br /> is over a given limit. Our alignment was within the normal limits. <br /> Steve completes the building safety checks and engine run reports to GRE. He also attended <br /> Generation school in Glencoe last month. <br /> Steve and Jeff are getting the bore rig ready for the underground boring season. <br /> • rm P0VERE1 0T <br /> W, <br /> Page 1 of 1 INATUREI <br /> Reliable Public P n w r 4 r n T c; S r a v r <br /> Power Provider <br />
The URL can be used to link to this page
Your browser does not support the video tag.