My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.9. SR 06-03-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
06-03-2013
>
4.9. SR 06-03-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 10:45:40 AM
Creation date
5/30/2013 10:42:33 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Total Consultant Cost <br /> Bolton&Menk,Inc.understands the importance of delivering a project on time and within <br /> budget. Staff productivity will be closely managed in order to deliver services that are both timely <br /> and cost effective.We propose to provide the engineering services as requested and as described in <br /> detail in this proposal on an hourly not-to-exceed basis fee as noted below. <br /> � . <br /> Design Construction Not-to-Exceed Cost <br /> Liquid Stream,Design Option 1 $411,445 $386,560 $798,005 <br /> Liquid Stream,Design Option 2 $411,445 $386,560 $798,005 <br /> Great River Energy Biosolids Option $39,180 $42,865 $82,045 <br /> Heat Drying Biosolids Option $274,795 $326,940 $601,735 <br /> Included in this section are detailed hour and fee tables for the above options. The Liquid Stream <br /> Options are combined into one table since the effort level is the same for either Liquid Stream <br /> option.The costs for the Great River Energy and Heat Drying biosolids options assume that a <br /> biosolids option will be designed and constructed at the same time as the Liquid Stream option. <br /> The above fees do not include geotechnical consultant costs. Bolton&Menk will coordinate <br /> directly with a geotechnical consultant and the City will pay any geotechnical costs directly. In <br /> addition,the above fees do not include regulatory or permit fees.Bolton&Menk will pay all <br /> regulatory and permit fees and these costs will be reimbursed by the City. It is anticipated that the <br /> following items are required and the associated fees will be reimbursed by the City: <br /> • Non-Degradation Review (MPCA) <br /> • Environmental Assessment Worksheet(MPCA) <br /> • NPDES Permit Modification(MPCA) <br /> Rates include labor,general business and other normal and customary expenses associated with <br /> operating a professional business.These rates also include vehicle and personal expenses,mileage, <br /> telephone, survey stakes and routine expendable supplies; and no separate charges will be made <br /> for these activities and materials. Expenses beyond the agreed scope of services and non-routine <br /> expenses, such as large quantities of prints,exponential increases in report copies,out-sourced <br /> graphics and photographic reproductions,document recording fees,outside professional and <br /> technical assistance and other items of this general nature,will be invoiced separately. Rates and <br /> charges do not include sales tax,if applicable. Rates shall apply for the duration of the project. <br /> Hourly rates for Bolton&Menk staff expected to work on this project are listed in the following <br /> rate table. <br /> Wastewater Treatment Facility Improvements I City of Elk River, Minnesota 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.