My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.9. SR 06-03-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
06-03-2013
>
4.9. SR 06-03-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2013 10:45:40 AM
Creation date
5/30/2013 10:42:33 AM
Metadata
Fields
Template:
City Government
type
SR
date
6/3/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Approach <br /> Task 9: Full Commissioning of Facility Design and Final Construction <br /> Description:This work includes the optimization of all electrical,HVAC, airflow and control <br /> work for any new buildings. Bolton&Menk will subconsult with a commissioning agent for <br /> this work. The commissioning subconsultant will provide an independent design review and <br /> optimization inspections of the completed buildings. Reports and correspondence generated from <br /> the commissioning agent will be forwarded to the City. <br /> Task 10: Full Construction and Contract Administration <br /> Description:Bolton&Menk will provide full construction and contract administration for the <br /> designed project. This work will include bidding services, award, and construction observation <br /> and contract administration through the entire construction process. During the construction <br /> process,the work will include attendance at monthly construction meetings, review of shop <br /> drawings,preparation of field orders,proposal requests and change orders, responding to requests <br /> for information from the contractor, and processing pay requests.We will also coordinate <br /> materials testing such as soil density testing and concrete testing with the selected geotechnical <br /> subconsultant. In addition,Bolton &Menk will assemble a draft operation and maintenance <br /> manual for City review and provide a final operation and maintenance manual that incorporates <br /> City comments. Submitting the draft operation and maintenance manual to the MPCA is a <br /> requirement and the manual must be submitted prior to starting the treatment process.A finalized <br /> copy of the operation and maintenance manual must also be submitted to the MPCA.At the <br /> end of the construction process, Bolton&Menk will provide the City with two copies of all <br /> shop drawings received. Bolton &Menk will also assemble the manufacturer's operation and <br /> maintenance manuals and provide the City with a cataloged and organized copy of all equipment <br /> manufacturer maintenance manuals. <br /> A critical piece for a successful project is the proper startup and operation of the treatment <br /> facilities. The contractor will be required to provide training to the City for the new equipment. <br /> In addition,Bolton &Menk will assist the City's operations staff with the proper operation of the <br /> treatment facilities. The selected option will have new treatment processes and our engineering <br /> and operations staff will assist the City's operation staff to ensure a complete understanding of the <br /> treatment process and operational parameters. <br /> Task 11: Final Warranty Inspection and Oversight of all Items <br /> Requiring Correction <br /> Description: Bolton&Menk will assemble a punch list for items that require completion and <br /> work with the general contractor to get these items completed. Once all punch list items are <br /> completed,any additional items that arise will become part of the warranty list. Typical language <br /> in the contract will require the contractor to provide a two year warranty.Any items that come <br /> up during the two year period will be put on the warranty list. Bolton &Menk will work with the <br /> general contractor to correct the items on the warranty list. <br /> Wastewater Treatment Facility Improvements I City of Elk River, Minnesota 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.