Laserfiche WebLink
2/28/2013 <br /> 1 1 <br /> BOLT`C�1�7 8.Il17�1V FC. I I°.tC. <br /> fantulllng Fnginners&5urreyo�s <br /> Biosolids Handling Cost Estimate <br /> Heat Drying <br /> Item Cost <br /> Mobilization $300,000 <br /> Site Work $200,000 <br /> Site P' m $100,000 <br /> Buildin 12,000 s ft $1,560,000 <br /> Polymer Feed System $50,000 <br /> Pumps/piping $150,000 <br /> Dewatering Equipment $600,000 <br /> Sludge Stora eAeration Equipment $150,000 <br /> Heat Drying Equipment $4,000,000 <br /> Conveying Systems $50,000 <br /> Odor Control S stem $150,000 <br /> Mechanical $750,000 <br /> Electrical/Controls $800,000 <br /> Total Construction Cost $8,860,000 <br /> Contingency 10% $886,000 <br /> En ineerin /Admin(15%) $1,329,000 <br /> Total Project Cost $11,075,000 <br /> BQL-°Caf,4$Ih/IEr-.IhC. IfVC. <br /> Ca0lu9110g Engmaef6&Sumps <br /> 10 <br />