My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-18-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
03-18-2013
>
8.1. SR 03-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2013 10:46:02 AM
Creation date
3/15/2013 8:58:36 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/28/2013 <br /> 1 1 <br /> BOLT`C�1�7 8.Il17�1V FC. I I°.tC. <br /> fantulllng Fnginners&5urreyo�s <br /> Biosolids Handling Cost Estimate <br /> Heat Drying <br /> Item Cost <br /> Mobilization $300,000 <br /> Site Work $200,000 <br /> Site P' m $100,000 <br /> Buildin 12,000 s ft $1,560,000 <br /> Polymer Feed System $50,000 <br /> Pumps/piping $150,000 <br /> Dewatering Equipment $600,000 <br /> Sludge Stora eAeration Equipment $150,000 <br /> Heat Drying Equipment $4,000,000 <br /> Conveying Systems $50,000 <br /> Odor Control S stem $150,000 <br /> Mechanical $750,000 <br /> Electrical/Controls $800,000 <br /> Total Construction Cost $8,860,000 <br /> Contingency 10% $886,000 <br /> En ineerin /Admin(15%) $1,329,000 <br /> Total Project Cost $11,075,000 <br /> BQL-°Caf,4$Ih/IEr-.IhC. IfVC. <br /> Ca0lu9110g Engmaef6&Sumps <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.