Laserfiche WebLink
2/28/2013 <br /> Biosolids Handling Cost Estimate <br /> Pump to Great River Energy <br /> Item Cost <br /> Site Work/Site Piping $150,000 <br /> Pumps $125,000 <br /> Sludge Storage Aeration Equipment $175,000 <br /> Electrical/Controls $90,000 <br /> Total Construction Cost $540,000 <br /> Contingency 10% $54,000 <br /> En ineerin /Admin(15%) $81,000 <br /> Total Project Cost $675,000 <br /> EE3(=)LTC7r-J$-r/i INK Ir=J C. <br /> 21 <br /> Recommendations <br /> • Implement Option 2 (Except UV) <br /> • Implement Biosolids Pumping to GRE <br /> • Discuss a Biosolids Treatment Contract with the <br /> City of Buffalo for Emergency Needs. <br /> • Keep Existing Biosolids Land Application Sites <br /> for Backup Biosolids Disposal Plans. <br /> BQ L--T'Qr-4$PA E—= INC• <br /> Cumming Enginters&Sumps <br /> 11 <br />