My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-18-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
03-18-2013
>
8.1. SR 03-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2013 10:46:02 AM
Creation date
3/15/2013 8:58:36 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/28/2013 <br /> Biosolids Handling Cost Estimate <br /> Pump to Great River Energy <br /> Item Cost <br /> Site Work/Site Piping $150,000 <br /> Pumps $125,000 <br /> Sludge Storage Aeration Equipment $175,000 <br /> Electrical/Controls $90,000 <br /> Total Construction Cost $540,000 <br /> Contingency 10% $54,000 <br /> En ineerin /Admin(15%) $81,000 <br /> Total Project Cost $675,000 <br /> EE3(=)LTC7r-J$-r/i INK Ir=J C. <br /> 21 <br /> Recommendations <br /> • Implement Option 2 (Except UV) <br /> • Implement Biosolids Pumping to GRE <br /> • Discuss a Biosolids Treatment Contract with the <br /> City of Buffalo for Emergency Needs. <br /> • Keep Existing Biosolids Land Application Sites <br /> for Backup Biosolids Disposal Plans. <br /> BQ L--T'Qr-4$PA E—= INC• <br /> Cumming Enginters&Sumps <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.