My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-18-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
03-18-2013
>
8.1. SR 03-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2013 10:46:02 AM
Creation date
3/15/2013 8:58:36 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 1.0 INTRODUCTION <br /> 1.1 Purpose <br /> The City of Elk River owns and operates a mechanical wastewater treatment facility serving the <br /> residents of Elk River as well as commercial and industrial users within the community. The <br /> wastewater treatment facility was originally constructed in 1977 and has gone through several <br /> upgrades since. <br /> The current draft of the National Pollutant Discharge Elimination System/State Disposal System <br /> (NPDES/SDS) for this facility includes new discharge limitations. As a result of the new permit <br /> limits and projected increased loads, the treatment facility must be evaluated. The purpose of this <br /> report is to evaluate the capacity of the existing facility and the ability to reliably achieve the <br /> reduced effluent limits at design flows and loads and develop a plan for plant modifications. <br /> The design flow and load projections presented in this report are consistent with the City's vision <br /> of anticipated residential and industrial growth. <br /> This report is intended to provide the City of Elk River with a basis for facility improvements <br /> required to serve the projected growth through a 20-year planning period based on the limits in <br /> the current Draft NPDES permit. <br /> 1.2 Report Organization <br /> To address the treatment facility evaluation the report is organized into the following sections: <br /> Section 1: Introduction <br /> Section 2: Design Considerations and Parameters <br /> Section 3: Evaluation of Existing Treatment Facilities <br /> Section 4: Wastewater Treatment Facility Improvements <br /> Section 5: Cost Estimate <br /> Section 6: Recommendations and Implementation <br /> City of Elk River—T12.104758 Page I <br /> Wastewater Treatment Facility Plan Prepared by Bolton&Menk,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.