Laserfiche WebLink
Table 5.1 <br /> Preliminary Cost Estimates for Liquid Stream Improvements <br /> Elk River Wastewater Treatment Facility <br /> Item Cost <br /> Design Option Design Option <br /> No. 1 No.2 <br /> Mobilization $300,000 $300,000 <br /> Site Work $600,000 $600,000 <br /> Site Pi in /Valves $200,000 $200,000 <br /> Grit Cyclone $15,000 $15,000 <br /> Clarifier Equipment for Existing and New(4) $500,000 $500,000 <br /> New Clarifier Structure(2) $200,000 $200,000 <br /> Trickling Filter Improvements $250,000 $250,000 <br /> Activated Sludge Basins $1,350,000 $1,950,000 <br /> Fine Pore Diffusers $140,000 $200,000 <br /> Blowers $250,000 $300,000 <br /> Secondary Clarifier Covers(3) $300,000 $300,000 <br /> RAS/WAS Building and Pumps $200,000 $200,000 <br /> Filter Chlorination System $30,000 $30,000 <br /> UV Upgrades $200,000 $400,000 <br /> Blower/Sludge Pumping Building $200,000 $200,000 <br /> Electrical/Controls $1,500,000 $1,700,000 <br /> New Control Building/Garage $1,200,000 $1,200,000 <br /> Total Construction Cost $7,435,000 $8,495,000 <br /> Contingency(10%) $744,000 $850,000 <br /> En ineerin /Admire(15%) $1,115,000 $1,274,000 <br /> Total Project Cost $9,294,000 $10,619,000 <br /> City of Elk River—T12.104758 Page 28 <br /> Wastewater Treatment Facility Plan Prepared by Bolton&Menk,Inc. <br />