My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 03-18-2013
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2013
>
03-18-2013
>
8.1. SR 03-18-2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2013 10:46:02 AM
Creation date
3/15/2013 8:58:36 AM
Metadata
Fields
Template:
City Government
type
SR
date
3/18/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.4.2. Projected Wastewater Flows <br /> Future wastewater flows were estimated using user projections based on land use <br /> classifications. The Ten States Standard of 100 gallons per capita per day was used in <br /> projection of flows. The wastewater flows were projected for two design options. <br /> Design Option No. 1 = Urban Service Area Only <br /> Design Option No. 2 = Urban Service Area& Outside Developments <br /> From here onward the above two options will be referred to as "Design Option No. 1" and <br /> "Design Option No. 2" in this report. <br /> The ADW flow for the design year 2035 was calculated by adding the existing flow to <br /> flow from projected areas of developments and flow from un-sewered connections. The <br /> AWW flows were projected using an AWW/ADW flow ratio of 1.14. Peak Hourly Wet <br /> Weather (PHWW) flows were calculated by multiplying AWW flows by a peaking factor <br /> of 1.60, which was calculated from existing flow data. To calculate Peak Instantaneous <br /> Wet Weather (PIWW) flow the peaking factor was increased by 25 percent to provide a <br /> peaking factor of 2.0. Detailed calculations for flow projections are provided in Appendix <br /> A. A summary of projected flows is given in Table 2.3 for both design options. <br /> Table 2.3 <br /> Summary of Projected Flows <br /> Elk River Wastewater Treatment Facility <br /> Design Option No. 1 Design Option No. 2 <br /> ADW MGD 3.11 ADW MGD 3.98 <br /> AWW MGD 3.55 AWW MGD 4.54 <br /> PHWW MGD 5.68 PHWW MGD 7.27 <br /> PIWW MGD 7.10 PIWW MGD 9.08 <br /> City of Elk River—T12.104758 Page 5 <br /> Wastewater Treatment Facility Plan Prepared by Bolton&Menk,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.